Laserfiche WebLink
The Preserve <br />Development Contract <br />comply with this provision will result in the City undertaking this work with costs to be <br />reimbursed by Developer pursuant to Paragraphs #'s 11 & 12. <br />19. The Developer shall cause to be performed to the City Engineer's satisfaction all <br />finish grading, and shall maintain said grading, until Certificates of Occupancy are issued for all <br />buildings within the Plat. During this period the Developer shall prevent erosion by wind and <br />water to the pursuant to the approved SWP and to the City Engineer's satisfaction. <br />20. The Developer shall install Plat monuments within prior to the issuance of any <br />building permits within the Plat. Said monuments shall be installed and certified by a registered <br />land surveyor. Monument locations must thereafter be verified prior to the issuance of any <br />Certificates of Occupancy for houses constructed within the development. <br />21. Developer shall instruct his engineer to provide adequate field inspection personnel <br />to ensure the project is constructed in accordance with approved plans and specifications. In <br />addition, the City's Engineer, at Developer's expense, shall also inspect the construction of <br />Required Improvements for the purpose of certifying the same and recommending acceptance by <br />City. Developer shall also complete construction staking for the project at Developer's expense. <br />22. An as -built survey will be required to verify elevations of each structure. <br />Required Improvements <br />23. The Required Improvements include: the lowering of the three Magellan pipelines <br />to facilitate the construction of Preserve Trail; public streets to serve the Plat; the construction of <br />water main and services; the extension of sanitary sewer main and services; storm sewer and <br />ponding; grading; establishment of vegetation, paving; concrete curb and gutter; street signage <br />and lighting. Any lighting that may become an ongoing City expense shall be coordinated with <br />the City and Xcel Energy to minimize future operational costs with Developer to bear system <br />installation costs to allow City to attain Xcel Energy's "Customer Owned Group V" rate. All <br />such Required Improvements, except the final lift of blacktop on the road, shall be completed on <br />-6_ <br />-7- <br />