Laserfiche WebLink
Capital Fund 400 - General 8,000 8,000 16,000 <br />Staining the wood at the Pioneer Park Pavilion. <br /> Pioneer Park - InField <br />Repair/Maintenance Parks 36 3 0 7,000 0 7,500 0 7,500 0 8,000 0 8,000 38,000 <br /> Capital Fund 400 - General 7,000 7,500 7,500 8,000 8,000 38,000 <br />Recrowning of softaball fields and outfield repairs <br /> Pioneer Park - Trail Repair Parks 37 2 0 0 0 0 0 105,000 0 0 0 0 105,000 <br /> Capital Fund 400 - General 105,000 105,000 <br />Repair trail as needed at Pioneer Park. Trails were inspected in 2021 and assigned replacement dates after reviewing the condition of the trails. 2024 - 2,780 LF of trail to replace at $55/LF plus design and engineering 2031 - <br />1,650 LF of trail to replace at $60/LF plus design and engineering <br /> Utility Vehicle Parks 38 2 0 0 0 0 0 0 0 40,000 0 0 40,000 <br /> Capital Fund 400 - General 40,000 40,000 <br />Replace 2022 Cushman utility vehicle. <br /> Pioneer Park - Soccer Field <br />Repair/Maintenance Parks 39 3 9,000 9,500 0 10,000 0 10,000 0 10,000 0 0 48,500 <br /> Capital Fund 400 - General 9,000 9,500 10,000 10,000 10,000 48,500 <br />Sand injection for the Pioneer Park soccer field. <br /> Park System Master Plan Update Parks 40 3 0 95,000 0 0 0 0 0 0 0 115,000 210,000 <br /> Capital Fund 400 - General 95,000 115,000 210,000 <br />Consultant for Park System Master Plan Update <br /> Gervais Mill Park - Trail <br />Repair/Maintenance Parks 41 3 0 0 0 0 40,000 0 0 0 0 0 40,000 <br /> Capital Fund 400 - General 40,000 40,000 <br />Repair trail as needed in Gervais Mill Park. <br /> Thunder Bay Park - Court <br />Resurfacing Parks 44 3 0 0 3,500 0 0 0 4,500 0 0 0 8,000 <br /> Capital Fund 400 - General 3,500 4,500 8,000 <br />Resurface basketball court at Thunder Bay Park. <br />Resurfaced in 2024 <br /> Spooner Park - Field <br />Repair/Maintenance Parks 45 3 0 6,000 0 6,000 0 6,000 0 6,000 0 7,000 31,000 <br /> Capital Fund 400 - General 6,000 6,000 6,000 6,000 7,000 31,000 <br />Spooner Park ballfield repair and maintenance <br /> Spooner Park - Bandshell <br />Structure Parks 46 3 0 100,000 0 0 0 0 0 0 0 0 100,000 <br /> Capital Fund 400 - General 100,000 100,000 <br />Update Spooner Park Bandshell <br /> Spooner Park - Upgrade <br />Bathrooms Parks 47 3 40,000 0 0 0 0 0 0 0 0 0 40,000 <br /> Department Project # Priority 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Total <br />Produced Using Plan-It CIP Software Page 8 / 2643