My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-12-2025 Council Packet
>
City Council Packets
>
2020-2029
>
2025
>
11-12-2025 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 1:13:03 PM
Creation date
2/13/2026 1:02:03 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
510
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Fund 400 - General 40,000 40,000 <br />Upgrade bathrooms at Spooner Park Upper Shelter. <br /> Rondeau Park - Picnic Shelter <br />Staining Parks 48 3 0 2,500 0 0 0 0 2,500 0 0 0 5,000 <br /> Capital Fund 400 - General 2,500 2,500 5,000 <br />Stain wood surfaces at the Rondeau Park picnic shelter. <br /> Rondeau Park - Court <br />Resurfacing Parks 49 3 0 0 3,500 0 0 0 4,000 0 0 0 7,500 <br /> Capital Fund 400 - General 3,500 4,000 7,500 <br />Rseurface basketball court at Rondeau Park. <br />Resurfaced in 2024 <br /> Pioneer Park - Passive Water <br />Feature Parks 50 3 0 27,000 0 0 0 0 0 0 0 0 27,000 <br /> Capital Fund 400 - General 27,000 27,000 <br />Install dock structure on the northeast stormwater pond. Install in conjunction with Shoreline Restoration Project. <br /> Pioneer Park - Vegetation <br />Restoration Parks 54 2 93,000 0 0 0 0 0 0 0 0 0 93,000 <br /> Capital Fund 400 - General 93,000 93,000 <br />Restore Vegetation and Stormwater within Pioneer Park. Staff should look at rerouting water feature discharge to irrigation reuse pond. 2024 - Consulting and Engineering - Bolten and Menk 2025 - Vegetation Restoration and <br />Stormwater Improvement - Bolten and Menk 2026 - Shoreline Restoration - Internal/RCWS <br /> Trail Improvements - <br />Waterworks Trail Connection Parks 56 3 0 200,000 0 0 0 0 0 0 0 0 200,000 <br /> Capital Fund 456 - Park Land 200,000 200,000 <br />Add bitumnious trail section along waterworks ROW. <br /> Skate Park - Joint Repair Parks 59 3 0 0 3,000 0 0 0 0 0 0 0 3,000 <br /> Capital Fund 400 - General 3,000 3,000 <br />Repair concrete joints for safety of skate park users. <br /> Skate Park - New Equipment Parks 60 3 0 0 80,000 0 0 0 0 0 0 0 80,000 <br /> Capital Fund 400 - General 80,000 80,000 <br /> Gervais Mill Park - Boardwalk Parks 61 3 0 0 0 60,000 0 0 0 0 0 0 60,000 <br /> Capital Fund 400 - General 60,000 60,000 <br />Add a boardwalk along the northern section of trail in Gervais Mill Park. This area is susceptible to the wet ground making it unpassable during wet seasons. Adding a boardwalk will enhance the user experience within the park. <br /> Gervais Mill Park - East Parking <br />Lot Repair Parks 62 3 0 100,000 0 0 0 0 0 0 0 0 100,000 <br /> Capital Fund 400 - General 100,000 100,000 <br />East parking lot repairs at Gervais Mill Park. <br /> Gervais Mill Park - Fishing Pier <br />Board Replacement Parks 63 3 0 0 0 0 40,000 0 0 0 0 0 40,000 <br /> Capital Fund 400 - General 40,000 40,000 <br /> Department Project # Priority 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Total <br />Produced Using Plan-It CIP Software Page 9 / 2644
The URL can be used to link to this page
Your browser does not support the video tag.