|
City of Little Canada
<br /> Fee Schedule Page 9 of 22
<br />Solar PV System Rating Inspection Fees
<br />0 – 5,000 watts
<br />5,001 – 10,000 watts
<br />10,001 – 20,000 watts
<br />20,001 – 30,000 watts
<br />30,001 – 40,000 watts
<br />40,001 watts and larger
<br />
<br />$90 $100
<br />$150 $165
<br />$225 $245
<br />$300 $330
<br />$375 $410
<br />$375 $410 and $25 for each additional 10,000 watts
<br />Street Lighting & Parking Lot Lights: $5 $10 per each standard
<br />Swimming Pools & Hot Tubs $100 $120 + $9 $12 per circuit (Includes 2 inspections)
<br />Transformers/Generators: up to 10kva = $5 11kva to 74kva = $45 $55
<br />75kva to 299kva = $60 $70 over 299kva = $165 $175
<br />Minimum fee permits expire in 6 months.
<br />Permits over the minimum fee and up to $250 $1,000 expire in 1 year.
<br />Refunds issued only on permits over the minimum amount and do not include state surcharges.
<br />
<br />State Surcharge $1.00
<br />** The permit fee is doubled if work starts before the permit is issued **
<br />
<br />ELECTRICAL PERMIT FEES – Commercial
<br />$50 $60 per trip or the fees below, whichever is greater
<br />Value Range Fee
<br />$1 - $1,000 $50.00 $60 per trip
<br />$1,001 - $2,000 $50.00 $60 for the first $1,000 plus $3.25 for each additional
<br />$100, or fraction thereof, to and including $2,000
<br />$2,001 - $25,000 $82.00 for the first $2,000 plus $14.85 for each additional
<br />$1,000, or fraction thereof, to and including $25,000
<br />$25,001 - $50,000 $423.55 for the first $25,000 plus $10.70 for each additional
<br />$1,000, or fraction thereof, to and including $50,000
<br />$50,001 - $100,000 $691.05 for the first $50,000 plus $7.45 for each additional
<br />$1,000, or fraction thereof, to and including $100,000
<br />$100,001 - $500,000 $1,063.55 for the first $100,000 plus $6.00 for each additional
<br />$1,000, or fraction thereof, to and including $500,000
<br />$500,001 - $1,000,000 $3,463.55 for the first $500,000 plus $5.10 for each additional
<br />$1,000, or fraction thereof, to and including $1,000,000
<br />$1,000,001 and up $6,013.55 for the first $1,000,000 plus $4.00 for each additional
<br />$1,000
<br />
<br />Refunds issued only for permits over $100 $120
<br />State Surcharge Valuation of the work x .0005
|