My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-28-2026 Council Packet
>
City Council Packets
>
2020-2029
>
2026
>
01-28-2026 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 1:19:30 PM
Creation date
2/13/2026 1:15:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 of 8 <br /> <br />shall furnish the COMPANY a Railroad Protective Liability Insurance policy providing for <br />protection of the COMPANY, in accordance with the Federal-Aid Policy Guide, Title 23, Part <br />140, Subpart 1 and any supplements to or revisions unless otherwise noted. The limits of the <br />policy shall be not less than $2,000,000 combined single limit per occurrence for bodily injury, <br />death, property damage and physical damage to property, with an aggregate limit of not less than <br />$6,000,000 per policy period. The insurance policy shall be delivered to and approved by the <br />COMPANY prior to entry upon or use of its property to commence work upon, over, under, <br />across or adjacent to COMPANY tracks by the contractor. <br />6. Subsequent to the award of any contract, and before any work is started on this project, a <br />conference shall be held between the representatives of the ROAD AUTHORITY, the <br />COMPANY, and the interested contractor at a time and place designed by the ROAD <br />AUTHORITY for the purpose of coordinating the work to be performed by the several parties <br />and at such time a schedule of operation will be adopted. <br />7. The COMPANY will credit the ROAD AUTHORITY for the salvage value of all track, <br />communication and signal line material used on a temporary basis during the construction of the <br />project and accepted by the COMPANY for return to its stock. The ROAD AUTHORITY shall <br />be afforded a reasonable opportunity to inspect materials recovered by the COMPANY prior to <br />disposal by sale of scrap. <br />8. When the roadway is to be closed to vehicular traffic while the railroad work is being <br />performed, the ROAD AUTHORITY at its expense shall furnish, erect, maintain and remove <br />the traffic control devices necessary to detour highway traffic after the COMPANY gives two <br />weeks’ advance notice to the ROAD AUTHORITY’S engineer. <br />When the COMPANY is to perform its work while maintaining highway traffic, the ROAD <br />AUTHORITY shall furnish or cause to be furnished, at its expense, the signs, barricades, and <br />traffic control devices for erection by the COMPANY after two weeks’ advance notice is given <br />to the ROAD AUTHORITY’S engineer. The COMPANY, at the expense of the ROAD <br />AUTHORITY, shall erect, maintain, relocate, and remove the signs, barricades, and other traffic <br />control devices, including the furnishing of flagmen, as required to maintain highway traffic <br />throughout the time the railroad work is being performed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.