Laserfiche WebLink
CHANGE ORDER #2 SUMMARY <br />ONTRACT ITEMS, <br />BLACKTURN EXTRA TRAIL WIDTH <br />1 9' WIDE TRAIL <br />2 10' WIDE TRAIL <br />T BLACKTURN EXTRA TRAIL WIDTH - TOTAL <br />FREIGHTERS TRAIL EXTRAS <br />1 CLEAR AND GRUB TREES <br />2 DIG UP & TRANSPLANT SHRUBS <br />3 CATCH BASIN <br />4 CITY SUPPLIED FILL MATERIAL. <br />5 12" & 18" CULVERT <br />6 PARKING LOT PATCH <br />T FIREFIGHTERS TRAIL EXTRAS - TOTAL <br />VALENTO TRAIL CB /PIPE REPAIR <br />1 PATCH /FABRIC MH & PIPE JOINT <br />T VALENTO TRAIL CB /PIPE REPAIR - TOTAL <br />LS <br />LS <br />LS <br />LS <br />EA <br />CY 1,09 <br />LE 5 <br />LS <br />1 <br />539.00 <br />1 5966.40 <br />THJS PERIOD <br />DTY, AMOUNY� <br />1,00 $39,00 <br />1.00 539.00 <br />1.00 5956 40 1.00 5966.40 <br />53,915,00 1,00 <br />5220.00 1.00 <br />51,800.00 1.00 <br />51.00 1,096.00 <br />536.00 50.00 <br />5745.00 1.00 <br />51,005.40 51005.40 <br />53,915.00 <br />5220.00 <br />51,800.00 <br />-51,096.00 <br />51,800.00 <br />5745.00 <br />1.00 <br />1.00 <br />1.00 <br />1096.00 <br />50.00 <br />1 00 <br />53,915.00 <br />5220.00 <br />51,800.00 <br />51,096.00 <br />51 80000 <br />5745.00 <br />57.384.00 57,384.00 <br />LS 1 52,135.00 1.00 52,135.00 1.00 52,135.00 <br />52,135.00 52,135.00 <br />WESTWINDS TRAIL SUBGRADE WORK <br />1 EXCAVATION CY 27 510.15 27.00 5274.05 27,00 5274.05 <br />2 CLASS 5 AGGREGATE TON 40.0 512.00 40.00 5480.00 40.00 5480.00 <br />3 GEOTEXTILE FABRIC LE 200.0 50.89 200.00 5178.00 200.00 5178.00 <br />T WESTWINDS TRAIL SUBGRADE WORK - TOTAL <br />5932.05 5932.05 <br />KELLOGG MS TRAIL EXTRAS <br />1 CLEAR & GRUB LF 1 51,475.00 1.00 51,475.00 1.00 51,475.00 <br />2 EXCAVATION CCY 122 510.15 122.00 51,238.30 122.00 51,238.30 <br />3 CLASS 5 AGGREGATE BASE SY 134 512.00 134.00 51 60800 134.00 51,608.00 <br />4 12' WIDE TRAIL LS 1 5399.30 1.00 5399.30 1.00 5399.30 <br />5 RAISE CATCH BASIN LS 1 5350.00 1.00 5350.00 1.00 5350.00 <br />T KELLOGG MS TRAIL EXTRAS - TOTAL <br />CHANGE ORDER #2 SUMMARY <br />T BLACKTURN EXTRA TRAIL WIDTH - TOTAL <br />T FIREFIGHTERS TRAIL EXTRAS • TOTAL <br />T VALENTO TRAIL CB /PIPE REPAIR • TOTAL <br />T WESTWINDS TRAIL SUBGRADE WORK - TOTAL <br />T KELLOGG MS TRAIL EXTRAS - TOTAL <br />55,070.60 $5,070.60 <br />TOTAL THIS PERIOD <br />51,005.40 <br />57,384.00 <br />52,135.00 <br />5932 05 <br />55,070.60 <br />TOTAL CHANGE ORDER #2 SUMMARY THIS PERIOD 516,527.05 <br />TOTAL TO DATE <br />51,005.40 <br />57,384 00 <br />52,135.00 <br />5932.05 <br />55,070.60 <br />TOTAL CHANGE ORDER #2 SUMMARY TO DATE 516,527.05 <br />