SCHEDULE 4.0 - PARKING LOTS
<br />1 2021.501 MOBILIZATION
<br />2 2104.505 REMOVE BITUMINOUS PAVEMENT
<br />3 2104.513 SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH)
<br />4 2105.501 COMMON EXCAVATION
<br />5 2105.501 COMMON POND EXCAVATION
<br />6 2211.501 AGGREGATE BASE CLASS 5
<br />7 2350.501 TYPE MV4 WEAR COURSE MIXTURE
<br />8 2350,502 TYPE LV3 BASE COURSE MIXTURE
<br />9 2357.502 BITUMINOUS MATERIAL FOR TACK COAT
<br />10 2501.515 12" RC PIPE APRON
<br />11 2503.541 12" RC PIPE SEWER OES 3006 CL V
<br />12 2503.603 10" HDPE PIPE SEWER
<br />13 2506.502 CONST DRAINAGE STRUCTURE DES SPEC
<br />14 2511.502 RANDOM RIPRAP CLASS III
<br />15 2531.501 CONCRETE CURB & GUTTER (SURMOUNTABLE)
<br />16 2531.501 CONCRETE CURB & GUTTER DESIGN 8618
<br />17 2557.517 VEHICULAR GATE - DOUBLE (16')
<br />18 2575.605 EROSION CONTROL BLANKET
<br />19 2575.607 TOPSOIL BORROW (CV)
<br />20 SPEC GRADATION TEST, CLASS 5
<br />21 SPEC PROCTOR TEST, CLASS 5
<br />22 SPEC PROCTOR TEST
<br />23 SPEC DENSITY TEST, INPLACE
<br />24 SPEC CONCRETE TESTING
<br />25 SPEC BITUMINOUS CORE DENSITY
<br />SCHEDULE 0.0 - PARKING LOTS - CONSTRUCTION TOTAL
<br />�■■■°^�• SORTMOt1
<br />■ 10.1' RTY'„-
<br />TOTA1. TO RAT& ;
<br />LS 1 33,000.00 0.00 30.00 1.00 53,000.00
<br />SY 115 52.70 0,00 50.00 32.00 58640
<br />LF 45 32.88 0.00 50.00 29.00 58352
<br />CY 556 69.25 0.00 $0.00 556.00 55.143.00
<br />CY 410 510.00 0.00 6000 410.00 $4,100.00
<br />TON 900 511.00 0.00 30.00 900.00 39,900.00
<br />TON 165 540.00 0.00 50.00 232.70 59,308 00
<br />TON 215 $37.25 0.00 30.00 221.75 58.260 19
<br />GAL 86 $1.20 4.00 84.80 94.85 5113.82
<br />EA 1 5975.00 0.00 30.00 1.00 8975.00
<br />LF 24 $40.00 28.00 51,120.00 46.00 67 840,00
<br />LF 22 535.00 0.00 50.00 34.00 31,190,00
<br />EA 1 52,300.00 0.00 $0,00 1.00 52,300.00
<br />TON 17 360.00 0.00 $0.00 17.00 51,020.00
<br />LF 126 $7.50 0.00 30.00 126,00 5945.00
<br />LF 395 57.55 0.00 $0.00 402.00 53,035.10
<br />EA 1 5923.00 0.00 $0.00 1.00 5923.00
<br />SY 30 84.00 0.00 50.00 0.00 30.00
<br />CY 110 514,10 0.00 30.00 69.00 S972.90
<br />EA 1 570,00 0.00 50.00 0.00 30.00
<br />EA 1 890.00 0.00 50.00 1,00 590.00
<br />EA 2 590.00 0.00 80.00 0.00 50.00
<br />EA 15 350.00 0.00 30.00 3.00 5150.00
<br />EA 4 3140.00 0.00 50.00 1,00 8140.00
<br />EA 9 $17.30 0.00 50.00 0.00 50.00
<br />31,124.80 $53,575.93
<br />SCHEDULE 5.0- RONDEAU PARK
<br />1 MOBILIZATION LS 1 33,800.00 0.00 30.00 1.00 53.800.00
<br />2 COMMON EXCAVATION CY 2404 36.50 1,00 56.50 2405.00 515,632.50
<br />3 CONNECT TO EXISTING STORM SEWER EA 1 51,200,00 0.00 80.00 1.00 81.200.00
<br />4 1.5" PVC PIPE SEWER LF 19 335.00 0.00 $0.00 10.00 5350.00
<br />5 6" PVC PIPE SEWER LE 154 319.00 0.00 $000 167.00 33,173.00
<br />6 1" COPPER WATER SERVICE PIPE LF 125 $19,00 0.00 30.00 48.00 3912.00
<br />7 3" BITUMINOUS PATH SY 1560 313.65 294.00 34,013.10 1854.00 325,307.10
<br />8 3" BITUMINOUS COURT SURFACE (SPORT COURT) SY 304 314.76 70.00 51,033.20 295.00 S4,354,20
<br />9 CONCRETE CURB DESIGN SPECIAL LF 292 324.00 0.00 30.00 500.00 312,000,00
<br />10 PEDESTRIAN CURB RAMP EA 3 $150.00 0.00 30.00 3.00 3450.00
<br />11 CONSTRUCT BENCH W /GONG, PAD EA 8 51,700,00 0.00 50.00 6.00 $10,200.00
<br />12 DRINKING FOUNTAIN W /CONO. PAD EA 1 35.100.00 0.00 80.00 1,00 35,100.00
<br />13 BASKETBALL HOOP & STAND EA 1 $3,200.00 0.00 30.00 1.00 33.200.00
<br />14 SPORT COURT COLORCOAT SY 304 38.50 70.00 3595.00 304.00 $2,584.00
<br />15 SPORT COURT STRIPING LS 1 8450.00 0.00 50.00 1,00 3450.00
<br />16 DENSITY TEST, INPLACE EA 15 550.00 1.00 350.00 6.00 5300.00
<br />17 CONCRETE TESTING EA 2 $140,00 0.00 30.00 0.00 50.00
<br />18 BITUMINOUS CORE DENSITY EA 3 317.30 0.00 80.00 0.00 50.00
<br />SCHEDULE 5.0- RONDEAU PARK - CONSTRUCTION TOTAL
<br />55.697.80 589,012.80
<br />SCHEDULE 6.0 - EXTRA WORK
<br />1 SPEC CHANGE ORDER 01 CY 3956.31 58.65 0.00 $0.00 3956.31 535,013.34