Laserfiche WebLink
PARTIAL PAYMENT ESTIMATE <br />NO. 7 <br />FROM: August 2, 2005 <br />TO: December 2, 2005 <br />CONTRACTOR: FRATTALONE COMPANIES, INC. <br />ADDRESS: 3066 SPRUCE STREET, ST. PAUL, MN 55117 <br />OWNER: CITY OF LITTLE CANADA <br />PROJECT: 2004 STREET IMPROVEMENTS <br />COMPLETION DATE: <br />ORIGINAL September 10, 2004 <br />REVISED: September 22, 2004 <br />AMOUNT OF CONTRACT: <br />ORIGINAL: $1,125,000.00 <br />REVISED: <br />ITEM SPEC. <br />NO. REF. <br />DESCRIPTION <br />CONTRACT ITEMS <br />UNIT'.. QTY. UNIT <br />PRICE <br />THIS PERIOD <br />QTY. AMO <br />TOTAL TO DATE <br />QTY. AMOUNT <br />SCHEDULE 1.0 - MIDDLE STREET STORM SEWER AND ROAD <br />1 2021501 MOBILIZATION <br />2 2101.501 CLEARING <br />3 2101.501 GRUBBING <br />4 2104.501 REMOVE CONCRETE CURB AND GUTTER <br />5 2104.501 REMOVE STORM SEWER PIPE <br />6 2104.501 REMOVE 18' RCP FLARED END SECTION <br />7 2104.505 REMOVE BITUMINOUS PAVEMENT <br />8 2104.505 REMOVE BITUMINOUS SIDEWALK <br />9 2104.505 REMOVE CONCRETE DRIVEWAY PAVEMENT <br />10 2104.509 REMOVE MANHOLE OR CATCH BASIN <br />11 2104.509 REMOVE SIGN <br />12 2104.513 SAW CUT BITUMINOUS PAVEMENT (FULL DEPTH) <br />13 2104.523 SALVAGE SIGN <br />14 2104.523 SALVAGE LIGHT <br />15 2104.604 SALVAGE CONCRETE PAVERS <br />16 2105.501 COMMON EXCAVATION <br />17 2211.501 AGGREGATE BASE CLASS 5 <br />18 2232.501 MILL BITUMINOUS PAVEMENT <br />19 2350.501 TYPE MV4 WEAR COURSE MIXTURE <br />20 2350.501 TYPE LV3 BASE COURSE MIXTURE <br />21 2357.502 BITUMINOUS MATERIAL FOR TACK COAT <br />22 2503.541 15' RC PIPE SEWER DES 3006, CLV <br />23 2503.541 21° RC PIPE SEWER DES 3006, CLV <br />24 2503.541 30' RC PIPE SEWER DES 3006, CLIII <br />25 2503.602 CONNECT TO EXISTING STORM SEWER <br />26 2506.502 CONST DRAINAGE STRUCTURE DESIGN 48 -4020 <br />27 2506.511 MANHOLE REPAIR <br />28 2511.502 RANDOM RIPRAP CL IV <br />29 2521.501 4" CONCRETE WALK <br />30 2531.501 CONCRETE CURB AND GUTTER DESIGN 8618 <br />31 2531.602 PEDESTRIAN CURB RAMP <br />32 2540.604 INSTALL CONCRETE PAVERS <br />33 2545.602 INSTALL LIGHT POLE <br />34 2563.601 TRAFFIC CONTROL <br />35 2564.536 INSTALL SIGN <br />36 2564.603 24° STOP LINE WHITE -POLY PREFORMED <br />37 SPEC GRADATION TEST, CLASS 5 <br />38 SPEC PROCTOR TEST, CLASS <br />39 SPEC PROCTOR TEST <br />40 SPEC DENSITY TEST - CLASS 5 & SUBGRADE <br />41 SPEC CONCRETE TESTING <br />42 SPEC BITUMINOUS CORE DENSITY <br />43 SPEC CALCIUM CHLORIDE <br />LS 532,860.85 0.00 50.00 1.00 532,860.85 <br />TREE $262.50 0.00 50.00 4.00 $1,050.00 <br />TREE $52.50 0.00 50.00 4.00 5210.00 <br />LF 50 52.20 0.00 $0.00 610.00 51,342.00 <br />LF 45 59.00 0.00 $0.00 438.00 53,942.00 <br />EACH 5200.00 0.00 50.00 1,00 5200.00 <br />SY 3,60 52.25 0.00 50.00 3446.00 $7,753.50 <br />57 17 $2.25 0.00 50.00 154.00 5346.50 <br />SY 4 55.00 0.00 50.00 54.00 $270.00 <br />EACH 5225.00 0.00 50.00 4,00 5900.00 <br />EACH $21.00 0.00 50.00 1.00 $21.00 <br />LF 37 53.00 0.00 50.00 359.00 51,077.00 <br />EACH 1 521.00 0.00 50.00 6.00 5126,00 <br />EACH 51,315.00 0.00 50.00 1.00 51,315,00 <br />SY 7 59.00 0.00 50.00 28.00 5252,00 <br />CY 92 58.75 0.00 $0.00 923.00 $8,076.25 <br />TON 1,20 57.50 0.00 50.00 1332.61 59,994.58 <br />SY 5 58.40 0.00 50.00 0.00 50.00 <br />TON 27 545.75 0.00 50.00 297.81 513,624.81 <br />TON 27 543.40 0.00 80.00 376.72 $16,349.65 <br />GAL 11 $1.05 0.00 50.00 0.00 $0.00 <br />LF 11 523.15 0.00 50.00 213,00 54930,95 <br />LF 8 $27.00 0.00 50.00 8,00 5216.00 <br />LF 28 541.65 0.00 50.00 292.00 512,161.80 <br />EACH 51000.00 0.00 50.00 1.00 51,000.00 <br />EACH 51,875.00 0.00 50.00 5.00 59,375.00 <br />EACH 5800.00 0.00 50.00 1.00 5800.00 <br />TON 12. 575.00 0.00 50.00 0.00 50.00 <br />SF 9,58 $2.66 0.00 $0.00 4284,00 511,395.44 <br />LF 1,35 59.92 0.00 50.00 1450.00 514,384.00 <br />EACH 5400.00 0,00 50.00 9.00 $3,600.00 <br />57 7 510,00 0.00 50.00 28.00 5280.00 <br />EACH 51,315,00 0.00 50.00 1.00 51.315.00 <br />LS 5840.00 0.00 50.00 1,00 5840.00 <br />EACH 1 589.25 0,00 50.00 6.00 $535.50 <br />LF 3 510.00 0.00 50.00 0.00 50.00 <br />EACH 5107.10 0.00 50.00 1,00 5107.10 <br />EACH 5137.50 0.00 50.00 1.00 5137.50 <br />EACH 5137.50 0.00 50.00 4.00 5550.00 <br />EACH 563.00 0.00 50.00 24.00 51,512.00 <br />EACH 5231.00 0,00 50.00 2.00 5462.00 <br />EACH $42.00 0.00 50.00 2.00 584.00 <br />GAL 90 $1.00 0.00 50.00 0.00 50.00 <br />SCHEDULE 1,0- MIDDLE STREET STORM SEWER AND ROAD - TOTAL 50.00 5163,397.42 <br />01Pmp016600J10071 /Partial Payments/Pay Estimate 07 (2004 Probst) <br />