Laserfiche WebLink
To: Joel Hanson, City Administrator <br />From: Mario & Kay Mariani <br />335 Rose Lane <br />Date: November 23, 2005 <br />RE: Neighborhood Meeting — Monday, November 28, 2005 — 6.00pm. <br />At Little Canada City Center, 515 Little Canada Road. <br />Joel, <br />Due to holiday travels we may not be able to attend the neighborhood meeting on <br />Monday, November 28i'. We do have some questions and concerns on the matter of our <br />road reconstruction. We do feel the road is in need of repairs and drainage <br />improvements. <br />• Finished Grade of Road- Currently the grade of the road where Morrison T's into <br />Rose is slightly higher than our driveway and garage. Because of this, during <br />heavy rains and melting snow, water ends up draining down our driveway. In the <br />winter it can not drain through the yard because of the frozen ground and build up <br />of snow piles along the driveway and it ends up re- freezing. <br />o Will the grade be higher, lower or the same after construction? <br />• Other questions: <br />o What type of curbs will be installed? <br />o Being our driveway is just three years old, how much of it will be <br />removed? <br />o Will the road be widened at all? <br />