87120 <br />Section B. City Cost Participation Construction, Right -of -Way <br />Acquisition and Design <br />The City shall, at the percentage indicated, participate in the <br />following construction to be performed along and adjacent to Trunk <br />Highway No. 35E from 1000 feet north of Trunk Highway No. 36 to 900 <br />feet north of County Road E partially within the corporate City <br />limits under State Project No. 6280 -304 (T.H. 35E =390) and State Aid <br />Project No. 200 - 010 -02. <br />1. 6.2 Percent shall be the City's rate of cost participation in all <br />of the storm sewer construction identified as the work items for <br />the Twin Lakes Area. The construction includes, but is not <br />limited to, those construction items as tabulated on Sheet No. 2 <br />of the attached Preliminary SCHEDULE "I ". <br />2. 14 Percent shall be the City's rate of cost participation in all <br />of the storm sewer construction identified as the work items for <br />the Edgerton Area. The construction includes, but is not <br />limited to, those construction items as tabulated on Sheet No. 3 <br />of the attached Preliminary SCHEDULE "I ". <br />3. 41 Percent shall be the City's rate of cost participation in all <br />of the storm sewer construction identified as the work items for <br />the Labore Area. The construction includes, but is not limited <br />to, those construction items as tabulated on Sheet No. 4 of the <br />attached Preliminary SCHEDULE "I ". <br />4. A lump sum in the amount of $219,225.26 shall be the City's rate <br />of cost participation in all of the pond excavation, right -of -way <br />6 <br />