My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2005 Council Agenda
>
City Council Packets
>
2000-2009
>
2005
>
09-14-2005 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2014 2:10:31 PM
Creation date
4/24/2012 10:52:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
87120 <br />acquisition and design costs as identified on Sheet 5 of the <br />attached Preliminary SCHEDULE "I ". <br />Section C. Construction Engineering Costs <br />The City shall pay a construction engineering charge in an amount <br />equal to 8 percent of the total cost of the City participation <br />construction covered under this Agreement. <br />Section D. Addenda, Change Orders and Supplemental Agreements <br />The City shall share in the costs of construction contract addenda, <br />change orders and supplemental agreements that are necessary to <br />complete the City cost participation construction covered under this <br />Agreement. <br />Section E. Liquidated Damages <br />All liquidated damages assessed the State's contractor in connection <br />with the construction contract shall result in a credit shared by <br />each party in the same proportion as their total construction cost <br />share covered under this Agreement is to the total contract <br />construction cost before any deduction for liquidated damages. <br />ARTICLE IV - PAYMENT BY THE CITY <br />Section A. Estimate and Advancement of the City's Cost Share <br />It is estimated that the City's share of the costs of the contract <br />construction plus the 8 percent construction engineering cost share, <br />right -of -way acquisition and design cost is the sum of $379,155.74 as <br />shown in the attached Preliminary SCHEDULE "I ". Upon award of the <br />construction contract the State shall prepare a Revised SCHEDULE "I" <br />based on construction contract unit prices. <br />After the following conditions have been met, the City shall advance <br />to the Commissioner of Transportation the City's total estimated <br />-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.