My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-25-2004 Council Agenda
>
City Council Packets
>
2000-2009
>
2004
>
02-25-2004 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2012 2:32:48 PM
Creation date
4/30/2012 2:22:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Commission <br />January 6, 2004 <br />Page Two <br />5. The utility plan indicates that the City will connect to the proposed watermain on the <br />northeast corner of the site. There is no City watermain at this location and none is <br />proposed. Therefore, the watermain there will be terminated with no connection. It may <br />be beneficial to add a hydrant at the end of this line for flushing purposes. The fire chief <br />should provide input on necessary hydrant spacing through the development. <br />6. The current layout of the north parking lot indicates access onto Market Place Drive. This <br />access would be within the Metro Transit bus lane for their transit center located along the <br />south side of Market Place Drive. Metro Transit has been contacted to provide input on <br />the impacts the driveway may have on the transit center and its operations. Sufficient <br />distance does exist between the Market Place Drive and the south edge of the north <br />parking lot to allow driveway access to Middle Street and still provide the required driveway <br />separation distance to the south parking lot driveway. City ordinance allows for only one <br />driveway per 125 feet of street frontage. The Middle Street frontage is only approximately <br />230 feet long; however including the Market Place Drive frontage, the property has over <br />500 feet of frontage. It is our opinion that access to the north parking lot should be to <br />Middle Street to avoid conflicts with the bus traffic and parking. <br />7. It appears the sidewalk on the south side of the east building stops at mid - building. We <br />would suggest that this sidewalk be extended to connect to the proposed City sidewalk <br />around the pond. <br />8. The grading plan indicates that all on -site drainage is being directed onto the City street. <br />The plan should be modified to collect all on -site drainage prior to discharge onto the street <br />and direct it into the storm sewer piping systems around the site. <br />9. The developer should supply a drainage and utility easement to each individual water <br />shutoff for City access to the water shutoff for each unit in case of emergency. <br />If you have any questions regarding these comments, please feel free to call. <br />Sincerely, <br />Howard R. Green Company <br />Lee Elfering, P.E. <br />City Engineer <br />LE:sw <br />C:\ windows \TEMP \Ltr - 010604- Planning Commission.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.