Laserfiche WebLink
Hamel Estates <br />Development Contract <br />Plan must be approved by the Ramsey - Washington Watershed District, including the completion <br />of a municipal coordination check list. It is also understood that the Erosion control plan must be <br />such that drainage to adjacent property is prevented and surface water run off is properly <br />controlled. Developer agrees to comply with any and all requirements for erosion control <br />directed by the Ramsey - Washington Watershed District and /or the City in a timely matter. <br />Developer's engineer shall certify that Plat grading is completed in accordance with the approved <br />grading and sediment control plan before the City shall issue any building penults. The <br />Developer shall remain ultimately responsible for accurate grading of all lots and shall correct <br />deficiencies in grading that may be discovered while this agreement is in effect. The City may <br />require sodding of any drainage swales to ensure protection of finished grades prior to the <br />occurrence of any housing construction. <br />17. Developer or their agents or assigns, shall keep the public streets clear of any soil, <br />earth or debris resulting from work done by Developer or their agents or assigns. Any such <br />materials must be promptly removed and in no event shall they be present more than 24 hours <br />after placement. Failure to comply with this provision will result in the City undertaking this <br />work with costs to be reimbursed by Developer pursuant to Paragraph #15. <br />18. The Developer shall cause to be performed to the City Engineer's satisfaction all <br />finish grading, and shall maintain said grading, until Certificates of Occupancy are issued for all <br />buildings within the Plat. During this period the Developer shall prevent erosion by wind and <br />water to the City Engineer's satisfaction. <br />19. The Developer shall install Plat monuments within one year after recording the Plat. <br />No building permit will be issued until the Plat monuments have been installed and certified by a <br />registered land surveyor. Monument locations must thereafter be certified for Certificates of <br />Occupancy to be issued. <br />20. Developer shall instruct his engineer to provide adequate field inspection personnel <br />to ensure the project is constructed in accordance with approved plans and specifications. In <br />addition, the City's Engineer, at Developer's expense, shall also inspect the construction of <br />