Laserfiche WebLink
Mr. Hanson <br />March 1, 2004 <br />Page Three <br />Estimated Construction Costs <br />Estimated construction costs have been provided for the four options discussed. A separate line <br />item has been included for the proposed watermain to serve the residents in the Twin Lake Area. <br />This watermain would need to be installed regardless of the chosen option and is defined as the <br />Base Watermain. The costs are as follows. <br />Table 3 <br />Estimated Construction Cost <br />Option <br />Estimated Construction Cost <br />Base Watermain <br />$465,000.00 <br />1 <br />$147,000.00 <br />2 <br />$205,000.00 <br />3 <br />$291,000.00 <br />4 <br />$85,000.00 <br />This information was compiled to assist in the decision making process for serving the Twin Lake <br />Area with watermain. If you have any questions or would like further information, please feel free <br />to call. <br />Sincerely, <br />Howard R. Green Company <br />Lee Deering, P.E <br />Attachments <br />cc: City of Little Canada City Council <br />C: \windows \TEMP \Itr 030104 Hanson.doc <br />- 3 0 - <br />