My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-23-2004 Council Agenda
>
City Council Packets
>
2000-2009
>
2004
>
06-23-2004 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2012 3:24:36 PM
Creation date
5/3/2012 3:16:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ce .. 9 % %r� CCan> /a <br />515 Little Canada Road, Little Canada, MN 55117 -1600 <br />(651) 766 -4029 / FAX: (651) 766 -4048 <br />www.el.little- canada.mn.as <br />MEMORANDUM <br />TO: Mayor and Members of the Council <br />FROM: Gregory Schroeder, Public Works Director <br />DATE: June 17, 2004 <br />RE: County Road D /Edgerton Street Improvements <br />Approval of Plans/ Authorization for Bid <br />MAYOR <br />Michael 1. Fahey <br />COUNCIL <br />Jim LaValle <br />Matt Anderson <br />Rick Montour <br />Bill Biesener <br />ADMINISTRATOR <br />Joel R. Hanson <br />As you may know, MNDOT is preparing to replace the Edgerton Street Bridge over I- 694/I -35E. <br />As part of that project, the approaches to this bridge will need to be reconstructed and the City of <br />Little Canada is proposing to install watermain within this construction area along County Road D <br />west of Edgerton Street. <br />MNDOT has completed the plans for the bridge approaches and has included the watermain and <br />storm sewer work requested by the City. The current cost estimate to install the watermain is <br />$67,582 of which $33,600 may be assessable. In addition, the bridge approaches are to be <br />reconstructed to an urban section and will include the installation of storm sewer. The portion of <br />the street reconstruction and storm sewer work to occur within the Little Canada City Limits is <br />currently estimated to cost $563,658 of which $337,704 is Ramsey Counties share and $186,748 is <br />the City of Little Canada share, with MNDOT responsible for the remaining. <br />This project is currently schedule for bid opening on July 23, 2004 and work is estimated to begin <br />in September 2004. <br />Staff recommends council approval of the plans and authorization to bid this project. <br />[I:AE regS \Conaspondenec )reg S 2001APlans approval County Road 1) tldgerion Slreet.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.