Laserfiche WebLink
86597 <br />ARTICLE III - BASIS OF PAYMENT BY THE CITY <br />Section A. SCHEDULE "I" and EXHIBIT "Cost Participation" <br />A Preliminary SCHEDULE "I" is attached and incorporated into this <br />Agreement. The Preliminary SCHEDULE "I" includes all anticipated <br />City cost participation construction items, the construction <br />engineering cost share and the City's cost share of the revised <br />drainage system covered under this Agreement. City cost participation <br />construction items are based on engineer's estimated unit prices. <br />EXHIBIT "Cost Participation ", colored estimated quantity sheets which <br />show all anticipated City cost participation construction covered <br />under this Agreement, is on file in the office of the State's <br />District Engineer and in the office of the State's Municipal <br />Agreements Engineer at St. Paul, and is incorporated into this <br />Agreement by reference. <br />Section B. City Cost Participation for Construction and the Design <br />of the Revised Drainage System <br />The City shall, at the percentage indicated, participate in the <br />design of the revised drainage system and the construction to be <br />performed adjacent to Trunk Highway No. 35E on Edgerton Street and on <br />County Road D within the corporate City limits in accordance with <br />State plans, specifications and special provisions designated as <br />State Project No. 6280 -317 (T.H. 35E =390), State Aid Project No. 62- <br />658-10, State Aid Project No. 209 - 020 -07 and in the records of the <br />Federal Highway Administration as Minnesota Project IM 6945 (126). <br />The construction includes the City's proportionate share of item <br />costs for mobilization, field laboratory and traffic control. <br />1. 100 Percent shall be the City's rate of cost participation in <br />all of the water main construction as shown in "Yellow" on <br />EXHIBIT "Cost Participation ", which is on file at the locations. <br />5 <br />6 <br />