My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-2004 Council Agenda
>
City Council Packets
>
2000-2009
>
2004
>
09-08-2004 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2014 8:58:24 AM
Creation date
5/9/2012 10:48:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
86597 <br />given in Section A. of this article. The construction includes, <br />but is not limited to, those construction items as tabulated on <br />Sheet No. 2 of the attached Preliminary SCHEDULE "I ". <br />2. 45 Percent shall be the City's rate of cost participation in all <br />of the storm sewer construction as shown in "Orange" on EXHIBIT <br />"Cost Participation ", which is on file at the locations given in <br />Section A. of this article. The construction includes, but is <br />not limited to, those construction items as tabulated on Sheet <br />No. 3 of the attached Preliminary SCHEDULE "I ". <br />3. 45 Percent of $21,380.67, which is $9,621.30 shall be the City's <br />rate of cost participation for the design costs of the revised <br />drainage system. The design cost participation shall be in a <br />lump sum amount and is tabulated on Sheet No. 1 of the attached <br />Preliminary SCHEDULE "I ". <br />Section C. Construction Engineering Costs <br />The City shall pay a construction engineering charge in an amount <br />equal to 8 percent of the total cost of the City participation <br />construction covered under this Agreement. <br />Section D. Addenda, Change Orders and Supplemental Agreements <br />The City shall share in the costs of construction contract addenda, <br />change orders and supplemental agreements that are necessary to <br />complete the City cost participation construction covered under this <br />Agreement. <br />Section E. Liquidated Damages <br />All liquidated damages assessed the State's contractor in connection <br />with the construction contract shall result in a credit shared by <br />each party in the same proportion as their total construction cost <br />6 <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.