Laserfiche WebLink
68 2564.602 <br />69 2564.802 <br />70 2564.602 <br />71 2584.602 <br />72 2584.602 <br />73 2564.603 <br />74 2564.603 <br />75 2564.603 <br />76 2564.603 <br />77 2564.603 <br />78 2584,603 <br />79 2564.604 <br />80 2565.511 <br />81 2555.601 <br />82 2565.601 <br />83 2573.502 <br />84 2575.501 <br />85 2575.502 <br />86 2575.505 <br />87 2575.511 <br />88 2575,519 <br />89 2575.523 <br />90 2575.532 <br />91 2575.605 <br />92 2580.502 <br />93 SPEC <br />94 SPEC <br />95 SPEC <br />96 SPEC <br />97 SPEC <br />98 SPEC <br />99 SPEC <br />INSTALL SIGN EACH <br />PAVEMENT MESSAGE (RIGHT ARROW) - POLY PREFORM EACH 5 <br />PAVEMENT MESSAGE (LEFT ARROW) - POLY PREFORM EACH 14 <br />PAVEMENT MESSAGE (THRU -LEFT ARROW)- POLY PREFOF EACH 3 <br />PAVEMENT MESSAGE (RR CROSSING) - POLY PREFORM EACH 2 <br />4" SINGLE WHITE - EPDXY LF 4465 <br />4" SOLID YELLOW - EPDXY LF 2225 <br />4" SKIP YELLOW - EPDXY LF 985 <br />4" DOUBLE YELLOW - EPDXY LF 775 <br />24" SOLID WHITE - EPDXY LF 155 <br />24" SOLID YELLOW -EPDXY LF 70 <br />CROSSWALK MARKING - POLY PREFORM SF 720 <br />FULL T ACT T CONTROL SIGNAL SYSTEM A SIG SYS 1 <br />EMERGENCY VEHICLE PREEMPTION SYSTEM LS 1 <br />REVISE SIGNAL SYSTEM B SYS 1 <br />SILT FENCE, TYPE HEAVY DUTY LF 1620 <br />SEEDING ACRE 3 <br />SEED MIXTURE 50A LB 150 <br />SODDING TYPE LAWN SY 12345 <br />MULCH TYPE TON 6 <br />DISK ANCHORING ACRE 3 <br />WOOD FIBER BLANKET REGULAR SY 2050 <br />COMMERCIAL FERTILIZER ANALYSIS 10-20-20 LB 1350 <br />EROSION CONTROL BLANKET 5Y 590 <br />TEMPORARY LANE MARKING LF 11520 <br />SPECIAL BROOMING SF 15700 <br />GRADATION TEST, CLASS 5 EACH 5 <br />PROCTOR TEST EACH 7 <br />DENSITY TEST, INPLACE EACH 42 <br />CONCRETE TESTING EACH 17 <br />BITUMINOUS CORE DENSITY EACH 24 <br />INSTALL CONDUIT LF 400 <br />CITY tiNFt <br />,_.;PRICE <br />6 <br />50.00 <br />180.00 <br />180.00 <br />360.00 <br />1100.00 <br />0.40 <br />0.42 <br />0.42 <br />0.03 <br />7.30 <br />7.50 <br />8.00 <br />150000,00 <br />5100.00 <br />10000.00 <br />2.25 <br />200.00 <br />4.00 <br />1.80 <br />175.00 <br />50.00 <br />1.25 <br />0.25 <br />7.90 <br />0.45 <br />0.20 <br />100.00 <br />100.00 <br />40.00 <br />175,00 <br />175.00 <br />20.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />3.34 <br />000 <br />240.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />584.50 <br />0.00 <br />300.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />T ©7`ATZ'rMAIN <br />TY <br />q :.: : AMowo ;I <br />0.00 0.00 <br />2.00 360.00 <br />15.00 2,700.00 <br />1.00 380.00 <br />2.00 2,200.00 <br />3908.00 1,563.20 <br />2319,00 973.98 <br />570.00 239.90 <br />877.00 727.91 <br />843.00 8,153,90 <br />20.00 150.00 <br />396.00 3,168.00 <br />1.00 150,000.00 <br />1.00 5,100.00 <br />1,00 10,000.00 <br />1264.00 2,849,00 <br />1.88 376.00 <br />107.00 428.00 <br />5025.00 9.045.00 <br />7.00 1,225.00 <br />1.88 94.00 <br />240.00 300.00 <br />829.00 207,25 <br />0.00 0.00 <br />7733,00 3,479.85 <br />0.00 0.00 <br />2.00 200.00 <br />4.00 400.00 <br />23.00 920.00 <br />3.00 525,00 <br />14.00 2,450.00 <br />811.00 16,220.00 <br />T SCHEDULE 1.0- STREET RECONSTRUCTION - TOTAL 1,484,50 1,052,492.91 <br />SCHEDULE 2.0 - STORM SEWER <br />1 2501.515 30" RC PIPE APRON EACH 1 776,00 0.00 0.00 1.00 776.00 <br />2 2501.521 29' SPAN RC PIPE - ARCH CULV. LF 117 64.00 0.00 0.00 111.00 7,104.00 <br />3 2501,521 42" SPAN CS PIPE - ARCH CULV. LF 48 100.00 0.00 0.00 48.00 4,800.00 <br />4 2501.525 29" SPAN RC PIPE - ARCH APRON EACH 1 692.00 0.00 0.00 1.00 692.00 <br />5 2503.511 12" CM PIPE SEWER LF 10 40.00 0.00 0.00 29.00 1,160,00 <br />6 2503.511 15" RC PIPE SEWER, DESIGN 3006 CL V LF 1273 22.00 0.00 0.00 1553.00 34,166.00 <br />7 2503.511 18" RC PIPE SEWER, DESIGN 3006 CL V LF 365 27.00 0.00 0.00 353.00 9.531.00 <br />8 2503.511 24" RC PIPE SEWER, DESIGN 3006 CL III LF 903 29.00 0.00 0.00 403,00 11,687.00 <br />9 2503.511 30" RC PIPE SEWER, DESIGN 3006 CL III LF 483 43.00 0.00 0.00 448.00 19,178.00 <br />10 2503.602 CONNECT TO EXISTING STORM SEWER EACH 1 150.00 0.00 0.00 1.00 150.00 <br />11 2503.602 CONNECT TO EXISTING MANHOLE (STORM) EACH 1 150.00 0.00 0.00 1.00 150.00 <br />12 2508.502 CONST DRAINAGE STRUCTURE DESIGN SPECIAL 24" X 36" EACH 10 988.00 0.00 0.00 15.00 14,520.00 <br />13 2506.502 CONST DRAINAGE STRUCTURE DESIGN 48 -4020 EACH 12 1248.00 0.00 0.00 20.00 24,960,00 <br />14 2506.502 CONST DRAINAGE STRUCTURE 0551011 60 -4020 EACH 2 2003.00 0.00 0.00 4.00 8,012.00 <br />15 2506.502 CONST DRAINAGE STRUCTURE DESIGN 72 -4020 EACH 2 2305.00 0.00 0.00 2.00 4,730.00 <br />16 2506.502 CONST DRAINAGE STRUCTURE DESIGN H EACH 1 1000.00 0.00 0.00 1.00 1,000.00 <br />17 2506.502 CONST DRAINAGE STRUCTURE -- OUTFALL STRUCTURE EACH 1 2700.00 0.00 0.00 1.00 2.700,00 <br />18 2506.521 INSTALL CASTING EACH 1 50.00 0.00 0.00 1.00 50.00 <br />19 2511.502 RANDOM RIPRAP CLASS IV TON 68.6 50.00 0.00 090 61.50 3,075.00 <br />20 SPEC STORM SEWER POND LS 1 81000.00 0.00 0.00 1.00 81,000.00 <br />T SCHEDULE 2.0- STORM SEWER - TOTAL 0.00 229,441,00 <br />SCHEDULE 3.0 - SANITARY SEWER <br />1 2104.501 REMOVE 8" VCP SANITARY SEWER LF 1095 0.01 0.00 0.00 1071.00 1071 <br />2 2503.511 8" 50R 35 PVC PIPE SEWER LF 1190 21.11 0.00 0.00 1169.00 24,677.59 <br />3 2503.602 CONNECT TO EXISTING SANITARY SEWER EACH 1 100,00 0.00 0.00 1.00 100,00 <br />4 2503602 CONNECT TO EXISTING SANITARY MANHOLE EACH 7 150.00 0.00 0.00 7.00 1,050,00 <br />5 2503.602 RECONNECT SANITARY SEWER SERVICE EACH 10 100,00 0.00 0.00 4,00 400.00 <br />6 2503.602 8 X 4 PVC WYE EACH 5 38.00 0.00 0.0D 4.00 152.00 <br />7 2503.602 8 X 6 PVC WYE EACH 5 41.00 0.00 0.00 3.00 123,00 <br />8 2503,603 4" PVC SANITARY SERVICE PIPE LF 75 19.29 0.00 000 53.00 1,022.37 <br />9 2503.603 6" PVC SANITARY SERVICE PIPE LF 75 20.70 0.00 0.00 14.00 289.80 <br />10 2506.602 CONSTRUCT SANITARY MANHOLE EACH 1 2158.00 0.00 0.00 1.00 2,158.00 <br />T SCHEDULE 3.0 LITTLE CANADA ROAD SANITARY SEWER - TOTAL 0.00 29,983.47 <br />SCHEDULE 4.0 - FIRST BANK DRIVE (CHANGE ORDER 42) <br />1 2563,601 TRAFFIC CONTROL LS 1 950.00 0.00 0.00 1.00 950.00 <br />2 2021.501 MOBILIZATION LS 1 14967.92 0.00 0.00 1,00 14,967.92 <br />3 2104.501 REMOVE BIT. CURB OR CONC. CURB LF 600 2.12 0.00 0.00 627.00 1,329.24 <br />4 2104.505 REMOVE BIT PAVEMENT SY 1278.00 1,15 0.00 0.00 1602,00 1,842.30 <br />5 2104.513 SAW BIT PAVEMENT LF 600 3.00 0.00 0,00 787.00 2,361,00 <br />6 2105.501 COMMON EXCAVATION CY 508 12.03 0.00 0.00 687.00 8,264.61 <br />0:2, 00029U1',1011W,y 6014t011V nEll <br />PAGE <br />