|
68 2564.602
<br />69 2564.802
<br />70 2564.602
<br />71 2584.602
<br />72 2584.602
<br />73 2564.603
<br />74 2564.603
<br />75 2564.603
<br />76 2564.603
<br />77 2564.603
<br />78 2584,603
<br />79 2564.604
<br />80 2565.511
<br />81 2555.601
<br />82 2565.601
<br />83 2573.502
<br />84 2575.501
<br />85 2575.502
<br />86 2575.505
<br />87 2575.511
<br />88 2575,519
<br />89 2575.523
<br />90 2575.532
<br />91 2575.605
<br />92 2580.502
<br />93 SPEC
<br />94 SPEC
<br />95 SPEC
<br />96 SPEC
<br />97 SPEC
<br />98 SPEC
<br />99 SPEC
<br />INSTALL SIGN EACH
<br />PAVEMENT MESSAGE (RIGHT ARROW) - POLY PREFORM EACH 5
<br />PAVEMENT MESSAGE (LEFT ARROW) - POLY PREFORM EACH 14
<br />PAVEMENT MESSAGE (THRU -LEFT ARROW)- POLY PREFOF EACH 3
<br />PAVEMENT MESSAGE (RR CROSSING) - POLY PREFORM EACH 2
<br />4" SINGLE WHITE - EPDXY LF 4465
<br />4" SOLID YELLOW - EPDXY LF 2225
<br />4" SKIP YELLOW - EPDXY LF 985
<br />4" DOUBLE YELLOW - EPDXY LF 775
<br />24" SOLID WHITE - EPDXY LF 155
<br />24" SOLID YELLOW -EPDXY LF 70
<br />CROSSWALK MARKING - POLY PREFORM SF 720
<br />FULL T ACT T CONTROL SIGNAL SYSTEM A SIG SYS 1
<br />EMERGENCY VEHICLE PREEMPTION SYSTEM LS 1
<br />REVISE SIGNAL SYSTEM B SYS 1
<br />SILT FENCE, TYPE HEAVY DUTY LF 1620
<br />SEEDING ACRE 3
<br />SEED MIXTURE 50A LB 150
<br />SODDING TYPE LAWN SY 12345
<br />MULCH TYPE TON 6
<br />DISK ANCHORING ACRE 3
<br />WOOD FIBER BLANKET REGULAR SY 2050
<br />COMMERCIAL FERTILIZER ANALYSIS 10-20-20 LB 1350
<br />EROSION CONTROL BLANKET 5Y 590
<br />TEMPORARY LANE MARKING LF 11520
<br />SPECIAL BROOMING SF 15700
<br />GRADATION TEST, CLASS 5 EACH 5
<br />PROCTOR TEST EACH 7
<br />DENSITY TEST, INPLACE EACH 42
<br />CONCRETE TESTING EACH 17
<br />BITUMINOUS CORE DENSITY EACH 24
<br />INSTALL CONDUIT LF 400
<br />CITY tiNFt
<br />,_.;PRICE
<br />6
<br />50.00
<br />180.00
<br />180.00
<br />360.00
<br />1100.00
<br />0.40
<br />0.42
<br />0.42
<br />0.03
<br />7.30
<br />7.50
<br />8.00
<br />150000,00
<br />5100.00
<br />10000.00
<br />2.25
<br />200.00
<br />4.00
<br />1.80
<br />175.00
<br />50.00
<br />1.25
<br />0.25
<br />7.90
<br />0.45
<br />0.20
<br />100.00
<br />100.00
<br />40.00
<br />175,00
<br />175.00
<br />20.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />3.34
<br />000
<br />240.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />584.50
<br />0.00
<br />300.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />T ©7`ATZ'rMAIN
<br />TY
<br />q :.: : AMowo ;I
<br />0.00 0.00
<br />2.00 360.00
<br />15.00 2,700.00
<br />1.00 380.00
<br />2.00 2,200.00
<br />3908.00 1,563.20
<br />2319,00 973.98
<br />570.00 239.90
<br />877.00 727.91
<br />843.00 8,153,90
<br />20.00 150.00
<br />396.00 3,168.00
<br />1.00 150,000.00
<br />1.00 5,100.00
<br />1,00 10,000.00
<br />1264.00 2,849,00
<br />1.88 376.00
<br />107.00 428.00
<br />5025.00 9.045.00
<br />7.00 1,225.00
<br />1.88 94.00
<br />240.00 300.00
<br />829.00 207,25
<br />0.00 0.00
<br />7733,00 3,479.85
<br />0.00 0.00
<br />2.00 200.00
<br />4.00 400.00
<br />23.00 920.00
<br />3.00 525,00
<br />14.00 2,450.00
<br />811.00 16,220.00
<br />T SCHEDULE 1.0- STREET RECONSTRUCTION - TOTAL 1,484,50 1,052,492.91
<br />SCHEDULE 2.0 - STORM SEWER
<br />1 2501.515 30" RC PIPE APRON EACH 1 776,00 0.00 0.00 1.00 776.00
<br />2 2501.521 29' SPAN RC PIPE - ARCH CULV. LF 117 64.00 0.00 0.00 111.00 7,104.00
<br />3 2501,521 42" SPAN CS PIPE - ARCH CULV. LF 48 100.00 0.00 0.00 48.00 4,800.00
<br />4 2501.525 29" SPAN RC PIPE - ARCH APRON EACH 1 692.00 0.00 0.00 1.00 692.00
<br />5 2503.511 12" CM PIPE SEWER LF 10 40.00 0.00 0.00 29.00 1,160,00
<br />6 2503.511 15" RC PIPE SEWER, DESIGN 3006 CL V LF 1273 22.00 0.00 0.00 1553.00 34,166.00
<br />7 2503.511 18" RC PIPE SEWER, DESIGN 3006 CL V LF 365 27.00 0.00 0.00 353.00 9.531.00
<br />8 2503.511 24" RC PIPE SEWER, DESIGN 3006 CL III LF 903 29.00 0.00 0.00 403,00 11,687.00
<br />9 2503.511 30" RC PIPE SEWER, DESIGN 3006 CL III LF 483 43.00 0.00 0.00 448.00 19,178.00
<br />10 2503.602 CONNECT TO EXISTING STORM SEWER EACH 1 150.00 0.00 0.00 1.00 150.00
<br />11 2503.602 CONNECT TO EXISTING MANHOLE (STORM) EACH 1 150.00 0.00 0.00 1.00 150.00
<br />12 2508.502 CONST DRAINAGE STRUCTURE DESIGN SPECIAL 24" X 36" EACH 10 988.00 0.00 0.00 15.00 14,520.00
<br />13 2506.502 CONST DRAINAGE STRUCTURE DESIGN 48 -4020 EACH 12 1248.00 0.00 0.00 20.00 24,960,00
<br />14 2506.502 CONST DRAINAGE STRUCTURE 0551011 60 -4020 EACH 2 2003.00 0.00 0.00 4.00 8,012.00
<br />15 2506.502 CONST DRAINAGE STRUCTURE DESIGN 72 -4020 EACH 2 2305.00 0.00 0.00 2.00 4,730.00
<br />16 2506.502 CONST DRAINAGE STRUCTURE DESIGN H EACH 1 1000.00 0.00 0.00 1.00 1,000.00
<br />17 2506.502 CONST DRAINAGE STRUCTURE -- OUTFALL STRUCTURE EACH 1 2700.00 0.00 0.00 1.00 2.700,00
<br />18 2506.521 INSTALL CASTING EACH 1 50.00 0.00 0.00 1.00 50.00
<br />19 2511.502 RANDOM RIPRAP CLASS IV TON 68.6 50.00 0.00 090 61.50 3,075.00
<br />20 SPEC STORM SEWER POND LS 1 81000.00 0.00 0.00 1.00 81,000.00
<br />T SCHEDULE 2.0- STORM SEWER - TOTAL 0.00 229,441,00
<br />SCHEDULE 3.0 - SANITARY SEWER
<br />1 2104.501 REMOVE 8" VCP SANITARY SEWER LF 1095 0.01 0.00 0.00 1071.00 1071
<br />2 2503.511 8" 50R 35 PVC PIPE SEWER LF 1190 21.11 0.00 0.00 1169.00 24,677.59
<br />3 2503.602 CONNECT TO EXISTING SANITARY SEWER EACH 1 100,00 0.00 0.00 1.00 100,00
<br />4 2503602 CONNECT TO EXISTING SANITARY MANHOLE EACH 7 150.00 0.00 0.00 7.00 1,050,00
<br />5 2503.602 RECONNECT SANITARY SEWER SERVICE EACH 10 100,00 0.00 0.00 4,00 400.00
<br />6 2503.602 8 X 4 PVC WYE EACH 5 38.00 0.00 0.0D 4.00 152.00
<br />7 2503.602 8 X 6 PVC WYE EACH 5 41.00 0.00 0.00 3.00 123,00
<br />8 2503,603 4" PVC SANITARY SERVICE PIPE LF 75 19.29 0.00 000 53.00 1,022.37
<br />9 2503.603 6" PVC SANITARY SERVICE PIPE LF 75 20.70 0.00 0.00 14.00 289.80
<br />10 2506.602 CONSTRUCT SANITARY MANHOLE EACH 1 2158.00 0.00 0.00 1.00 2,158.00
<br />T SCHEDULE 3.0 LITTLE CANADA ROAD SANITARY SEWER - TOTAL 0.00 29,983.47
<br />SCHEDULE 4.0 - FIRST BANK DRIVE (CHANGE ORDER 42)
<br />1 2563,601 TRAFFIC CONTROL LS 1 950.00 0.00 0.00 1.00 950.00
<br />2 2021.501 MOBILIZATION LS 1 14967.92 0.00 0.00 1,00 14,967.92
<br />3 2104.501 REMOVE BIT. CURB OR CONC. CURB LF 600 2.12 0.00 0.00 627.00 1,329.24
<br />4 2104.505 REMOVE BIT PAVEMENT SY 1278.00 1,15 0.00 0.00 1602,00 1,842.30
<br />5 2104.513 SAW BIT PAVEMENT LF 600 3.00 0.00 0,00 787.00 2,361,00
<br />6 2105.501 COMMON EXCAVATION CY 508 12.03 0.00 0.00 687.00 8,264.61
<br />0:2, 00029U1',1011W,y 6014t011V nEll
<br />PAGE
<br />
|