Laserfiche WebLink
IP710N <br />7 2105.525 TOPSOIL BORROW (LV) <br />8 2211.501 AGGREGATE BASE CLASS 5 <br />9 2232.501 MILL BIT PAVEMENT <br />10 2350.609 MV3 BITUMINOUS BASE <br />11 2350.609 LV3 BITUMINOUS BINDER <br />12 2350.809 MV3 BITUMINOUS WEAR <br />13 2357.502 TACK COAT <br />14 2506.516 MANHOLE CASTING <br />15 2531.501 CONCRETE CURB <br />16 2531.602 PEDESTRIAN RAMPS <br />17 2535.501 BIT CURB <br />18 2575.505 SODDING <br />19 SPEC ELECTRICAL <br />20 SPEC 4" CONCRETE SLAB <br />21 SPEC 8' BITUMINOUS PATH (NO CLASS 5) <br />T SCHEDULE 4.0 - FIRST BANK DRIVE (CO #2) . TOTAL <br />SCHEDULE 5.0 - ADDITIONAL WORK <br />1 SPEC SIGNAL POLE MODIFICATIONS LS <br />2 SPEC RELOCATE SIGNAL POLE LS <br />3 SPEC TEMPORARY POWER SUPPLY LS <br />4 SPEC WATERMAIN OFFSETS LS <br />5 SPEC BURIED DEBRIS REMOVAL LS <br />7 SPEC WATERMAIN WORK LS <br />8 SPEC ROUND LAKE STORM SEWER WORK LS <br />9 SPEC ADDITIONAL BITUMINOUS WEAR (C0 #1) LS <br />T SCHEDULE 6.0 - ADDITIONAL WORK - TOTAL <br />edNTRper <br />UNIT QTY <br />CY <br />TON <br />SY <br />TON <br />TON <br />TON <br />GAL <br />EACH <br />LF <br />EACH <br />LF <br />SY <br />LS <br />SF <br />LS <br />BID SUMMARY <br />SCHEDULE 1.0- STREET RECONSTRUCTION - TOTAL <br />SCHEDULE 2.0 - STORM SEWER - TOTAL <br />SCHEDULE 3.0 LITTLE CANADA ROAD SANITARY SEWER - TOTAL <br />SCHEDULE 4.0 - FIRST BANK DRIVE (CO #2) - TOTAL <br />SCHEDULE 5.0 - ADDITIONAL WORK - TOTAL <br />TOTAL BID SUMMARY THIS PERIOD <br />TOTAL BID SUMMARY TO DATE <br />30 <br />802 <br />600 <br />180 <br />150 <br />240 <br />150 <br />1 <br />30 <br />1 <br />575 <br />200 <br />1.00 <br />120 <br />1 <br />25.00 <br />7.90 <br />8.00 <br />34.80 <br />35.00 <br />36.43 <br />1.20 <br />350.00 <br />22,00 <br />225.00 <br />5.00 <br />8.00 <br />11737.94 <br />3.60 <br />5700.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Rind i <br />A$�IOUNtI <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />30.00 <br />916.00 <br />530.00 <br />228.00 <br />148.00 <br />324.00 <br />250.00 <br />1.00 <br />67.00 <br />1.00 <br />555.00 <br />150.00 <br />1.00 <br />123.00 <br />1.00 <br />010478 <br />Ap70NIF <br />750.00 <br />7,236.40 <br />4,240.00 <br />7,934,40 <br />5,110.00 <br />11,803.32 <br />300.00 <br />350.00 <br />1,474.00 <br />225.00 <br />2,825.00 <br />1,200.00 <br />11,737.94 <br />442.80 <br />5,700.00 <br />0.00 91,043.93 <br />4917.00 0.00 0.00 <br />5046.41 0.00 0.00 <br />1080.61 0.00 0.00 <br />8660.64 0.00 0.00 <br />7557.41 0.00 0.00 <br />5492.04 0.00 0.00 <br />17265.27 0.00 0.00 <br />4989.32 0.00 0.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />4,917.00 <br />5,048.41 <br />1,085.61 <br />8,660.64 <br />7,557.41 <br />5,492.04 <br />17,265.27 <br />4,969.32 <br />0.00 55,016.70 <br />1,484.50 1,052,492.91 <br />0.00 229,441.00 <br />0.00 29,983.47 <br />0.00 91,043.93 <br />0.00 55.018.70 <br />$1,484.50 <br />AMOUNT EARNED <br />AMOUNT RETAINED <br />MATERIAL ON SITE <br />MATERIAL DEDUCT. • <br />(PREVIOUS PAYMENTS <br />-$133,515.50 <br />$15,014.93 <br />51 457,978.01 <br />$000 <br />'AMOUNT DUE <br />00,0 50JW0) I'Pav Gil�0oi11 LVn:y <br />PAR <br />5000 _ -_.. .80.00. <br />0.99 .. ...''$0 00': <br />31 575,578.58 <br />7,600.57 5117,600.57, <br />$1,457,978.01 <br />