My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-24-2002 Additions
>
City Council Packets
>
2000-2009
>
2002
>
07-24-2002 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2012 9:39:48 AM
Creation date
5/14/2012 9:39:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROLF LOKENSGRRD RIR TEL NO.651 452 3251 Jul 24.02 9:21 P.01 <br />"" . JUHN ULIVER & ASSOC PAGE 04/04 <br />Ctvt! Engineering <br />Land Surveying <br />Land Planning <br />John Oliver & Associates, Inc. <br />201 Wei Travelers Trail, Suite 210 <br />Burnsville, MN 55337 <br />(952) 8944045 Fax (952) 894 -3049 <br />DATE: 7/23/02 <br />TO: <br />Mayor, City Council <br />City of Little Canada <br />51.5 Little Canada Road East <br />Little Canada, MN 55117 -1633 <br />RE: Poolside Building Addition: <br />r�#Y b(AFILe N- <br />Mayor and Members of the City Council: <br />We have entered into a contract with Stroman Construction and Design, Inc. to perform <br />the site surveying and engineering design for the project as of July 17, 2002. To date, I <br />have reviewed the available existing site information, talked with several members of the <br />City's staff and have performed a field review of the site. <br />Our firm will be performing a boundary and topographic survey for the site. Once the <br />survey is completed, final site engineering drawing will be produced. We will work <br />closely with City staff to insure that any issues that they may have concerning this site are <br />addressed. The proposed addition will not only help expand their business, but will help <br />clean up the site by removing many of the undesirable visual aspects that exist with this <br />site as it currently operates. <br />1 expect that we should be able to complete the boundary and topographic survey in the <br />net couple of weeks and that final plans should be completed within one month, if not <br />sooner. Based upon my review of the project, 1 do no see any major engineering issues <br />with the proposed addition. 1 would ask that the City Council Approve the project at this <br />time, contingent on staff approval of the final plans prior to the issuance of a building <br />permit. We will continue to work with City staff in the development of the final plans to <br />insure that this will be a quality project and that the concerns of the City's staff are <br />addressed. <br />Sincerely; <br />Jay R. Hill, PE LSIT <br />John Oliver & Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.