My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-24-2002 Additions
>
City Council Packets
>
2000-2009
>
2002
>
07-24-2002 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2012 9:39:48 AM
Creation date
5/14/2012 9:39:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Round Lake Strom Water Pond Area <br />Cost Estimate <br />Stabilize Pond Water Level <br />6" well, pump, motor, pitless adapter $ 24,000 <br />Meter pit and piping $ 5,000 <br />Rock sawle $ 3,000 <br />Controls $ 8,000 <br />$ 40,000 <br />Pond Vegetation $ 2,400 <br />Area Grass <br />2" Black dirt& Hyro Seed $ 8,040 <br />Total Estimate $ 50,440 <br />
The URL can be used to link to this page
Your browser does not support the video tag.