Laserfiche WebLink
Re lace Sewer Cleanin Nozzles for Vactor <br />The nozzles used to clean our sewers have worn out and need to be replaced. Replacement cost for <br />the needed nozzles is $6,000. <br />Leak Detection Contract <br />The City has water mains that are bedded in soils that shorten the life of our system. If we keep our <br />water system, I am proposing that we establish a leak detection contract for about $2,000 to inspect a <br />section of our system every other year to proactively find leaks in our water system. This will help <br />reduce water loss in our system and thus the loss of revenues for the city. <br />Inflow Inspections (Apartments /Commercial) <br />We are still experiencing some clear water inflow into our sanitary sewer system and suspect that <br />some of this may be due to roof drains on apartments and commercial buildings. We are proposing to <br />have the city engineer perform inspections of these buildings for the estimated cost of $5,000. <br />Tower Overhead Door <br />The existing water tower overhead door is worn out and needs to be replaced. We have tried <br />numerous times to have it cleaned and adjusted. The replacement cost is $2,000. <br />Roof for Meter House <br />The city owns and maintains a small building near Roselawn that contains the meter that is used to <br />track the amount of water that we get from the St. Paul Water Plant. If we keep the water system, the <br />roof on this building needs to be replaced. The replacement cost is estimated at $4,000. <br />8- <br />