Laserfiche WebLink
CHANGE ORDER <br />(Instructions on reverse side) No. 1 <br />PROJECT: 2003 Street and Utility Improvements DATE OF ISSUANCE: September 5, 2003 <br />OWNER: City of Little Canada <br />515 Little Canada Road OWNER's Project No. 819690 J <br />Little Canada, MN 55117 <br />CONTRACTOR: Park Construction, Inc. ENGINEER: Howard R. Green Company <br />500 -73rd Avenue NE, Suite 123 1326 Energy Park Drive <br />Minneapolis, MN 55432 St. Paul, MN 55108 -5202 <br />CONTRACT FOR: 2003 Street and Utility <br />Improvements ENGINEER's Project No. 819690 J <br />You are directed to make the following changes in the Contract Documents. <br />Description: During the street excavating and grading unforeseen soil conditions were encountered <br />between stations 0 +28 and 4 +50 on Market Place Drive, which required an additional subcut of <br />approximately 3 feet. The material removed was a mix of concrete debris, trees, and stumps. The <br />additional material was hauled off-site to a landfill that would accept the material. 3,956.31 cy was <br />removed and disposed of at a rate of $8.85 / cy for a total of $35,013.34. <br />CHANGE IN CONTRACT PRICE: <br />Original Contract Price <br />$ 1,172,914.52 <br />CHANGE IN CONTRACT TIME: <br />Original Contract Time <br />days or date <br />Previous Change Orders No. to No. <br />Net change from previous Change Orders <br />$ 0.00 <br />Days <br />Contract Price prior to this Change Order <br />$ 1,172,914.52 <br />Contract Time Prior to this Change Order <br />days or date <br />Net Increase (Decrease) of this Change Order <br />$ 35,013.34 <br />Net Increase (Decrease) of this Change Order <br />N/A <br />Days <br />Contract Price with all approved Change Orders <br />$ 1,207,927.86 <br />Contract Time with all approved Change Orders <br />days or date <br />RECOMMENDED: APPROVED: APPROVED: <br />By By By <br />Howard R. Green Company City of Little Canada Contractor <br />EJCDC No. 1910 -8 -B (1996 Edition) <br />819690 J -front <br />1 <br />