Laserfiche WebLink
Planning Commission <br />February 7, 2008 <br />Page Two <br />Landscape Plan <br />1. A detailed infiltration pond planting plan should be developed. The pond will receive <br />stormwater runoff immediately after construction; therefore we would recommend plug <br />plantings within the water ponding area instead of seeding. Plant materials should be <br />specified based on the amount of water inundation each area will receive; the <br />Watershed staff could assist the developer in determination of planting materials. <br />The above comments should be addressed and plans resubmitted for review and approval. If <br />you have any questions concerning this information, please call me at (763) 780-0450 ext. 13. <br />Sincerely, <br />Elfering & Associates <br />.,~_ f°,-~~,~ <br />Lee Elfering, P.E. <br />City Engineer <br />Z:\PROJ\120109E-Express Image\ltr-020708-PC.doc 15 <br />