Laserfiche WebLink
■ <br />4 Instailatzar owner pump station, 4,000.00 VA; , V WY <br />5 Piping, fittinyy, guiderail systen 6,500.00 0% 100% 6,500.00 0% <br />6 tlectrical + owner elec. entry cc 3,900.00 0% 1 00% 3,900.00 0% <br />7 Sewage bypass system 7,300.00 0% 100% (,500.00 0% <br />Totat9 Diana Lune 27,200.00 0% 1 00% 27.280.00 0% <br />Change ordcra 0.00 <br />Total Contract $.97,140.00 $1.00 100% $97,140.00 0% <br />Less 5% Retained <br />Total amount carved <br />Lea previous <br />Amount due <br />PAGE 11 <br />S4,857.00 ✓ <br />304.223.00 ✓ <br />$77,701.20 ✓ <br />314,381.80 ✓ <br />