My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-27-2001 Council Agenda
>
City Council Packets
>
2000-2009
>
2001
>
06-27-2001 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2014 11:55:42 AM
Creation date
6/25/2012 3:21:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />JANUARY 25, 1995 <br />The foregoing resolution was duly seconded by Scalze. <br />Ayes (5) LaValle, Scalze, Pedersen, Fahey, Morelan. <br />Nays (0). Resolution declared adopted <br />Fahey pointed out that occupancy permits would not be <br />issued until all the utility improvements are in. <br />Howe indicated that he would only be asking for <br />building permits for the models, and would not request <br />occupancy permits. <br />PUD & Fahey opened the public hearing to consider the <br />PRELIMINARY applications for Planned Unit Development to allow <br />PLAT - more than one owner - occupied office building on a lot, <br />REAL ESTATE as well as a Preliminary Plat for eight (8) office <br />MASTERS building sites. The Planner and Planning Commission <br />have recommended approval. <br />Steve Bienke, Fine Line Design, planner for the . <br />project, reported that the parcel consists of 4.77 <br />acres an County Road D. On the site is a house which <br />is currently being used as an office building. 60% of <br />the site is power line easement. The proposal is to <br />create an office campus which will compliment the <br />residential neighborhood and provide a good transition <br />from the commercial to the west and the residential to <br />the east. <br />Bienke reported that eight buildings are proposed, and <br />each would be individually owned and would be occupied <br />by professional -type businesses. The project would be <br />managed as a townhome development. Eight detached <br />storage garages are also planned along the south <br />property line. These will be sold with•the individual <br />office buildings and would be used for storage of <br />materials associated with. the buildings. <br />Bienke reported that the project will have a <br />residential character, would be a traditionally- styled <br />building with hip roofs, stucco siding and stone base. <br />Two sizes are planned, one 3,600 square feet in size, <br />and the other 2,400 square feet. These buildings have <br />the potential to be subdivided. <br />Bienke reviewed the landscape plan for the project, and <br />at the direction of the Planning Commission will be <br />adding landscaping on the easterly residential <br />Page 147 <br />
The URL can be used to link to this page
Your browser does not support the video tag.