My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-21-2000 Council Agenda
>
City Council Packets
>
2000-2009
>
2000
>
11-21-2000 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2012 1:46:05 PM
Creation date
6/26/2012 1:43:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y11NT5 i S <br />PLANNENG CDM?vUISSION <br />SEPTE:VIBER.11, 1997 <br />Frattalone stated that it would be difficult to sell the property when it is <br />still zoned B -3. <br />Barraciough asked if Frattalone wanted to begin building in the spring. <br />Frattalone replied that due to the extensive site work required, building <br />would not begin until the fall of 1998. <br />Mr. Montour recommended that the St. Paul Water Department site <br />located off Spruce Street be rezoned from General Business (B -3) to <br />Industrial Park (I -P) as requested by Mr. Frank.Frattalone. <br />Motion seconded by Carson. <br />Motion carried 5 — 0. <br />The City Planner reported.that the City can place conditions on the <br />development of the site at the time of site plan approval. <br />ARCM- Mr. Doug Kennedy,. representing Arby's, appeared before the Commission <br />TECTURAL requesting architectural review approval for the redevelopment of the <br />REVIEW — former Hardee's site into. an Arby's Restaurant. - - <br />ARBY'S • <br />Mr. Scott Mars, architect for the project, reviewed the site plans and <br />facade of the building in detail. Mars noted that the solarium area will be <br />removed and replaced with traditional windows. Mars further noted that <br />the cedar shakes on the drive - through will be painted to match the • <br />building. Canopies will be added over the windows, and will be either <br />canvas or metal. <br />Keis asked about signage. <br />Kennedy reported that their sign company has been working with City <br />staff. The only building signage will be over the front door.. There are <br />pians for a 21 foot pylon with a reader board. The existing sign poles. will <br />be used for this sign. <br />Kennedy pointed out the recommendations in the Planner's report <br />regarding the use of natural colors and modifying the drive - through <br />canopy. Kennedy felt that the existing brick on the building was a natural <br />color, and submitted samples of the other colors that Arby's is proposing <br />to use. Kennedy also asked that the existing drive- through be allowed to <br />remain, with the modification proposed to paint the cedar shakes to match <br />the rest of the building. <br />Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.