<br />SOHFQULE 4.0 - FIRST BANK OWE (CHANGE ORDER 031
<br />1 2503.001 TRAFFIC CONTROL LS 1 950,00 1.00 950,00 1.00 950.00
<br />2 2021.501 MOOIUZATION LS 1 14987.92 100 10087.92 1.00 14,807,82
<br />3 2104.501 REMOVE 803. CURB OR CONC.OURB IF 000 2.12 82700 1,32924 627,0) 1,32924
<br />4 2104.505 REMOVE BIT PAVEMENT 5Y 127400 1.15 100200 4,04240 160200 1,642.20
<br />6 2101,513 SAWOR PAVEMENT LP 600 300 737.00 2.381.00 737.00 2.301.00
<br />0 2105.501 COMMON EXCAVATION CY 508 12.03 667,00 8,264.81 887.00 8,264,01
<br />7 2105,525 TOPSOIL BORROW(LV) CY 30 25.00 0.00 0.00 0.00 0.00
<br />0 2211.501 AGGREGATE BASE CLASS 6 TON 802 7.90 915.00 7,230,40 918.00 7,21600
<br />0 2232501 MILL BIT PAVEMENT SY 800 8.00 530.00 4.240.00 530.00 4,200.00
<br />ID 2350.003 MV3 BITUMINOUS BASE TON 180 34.80 228,00 T,934A0 278,00 7,934.00
<br />11 2350.900 LV3 BITUMINOUS BINDER TON 150 35.00 14600 5,110,00 140.00 5,110.00
<br />12 2350.609 h1V30ITUMINOUSWFAR TON 240 38,43 324.00 11,803,32 324.00 11,803,32
<br />13 2357.502 TACK COAT 13.1. 150 120 250.00 300.00 250.00 300.00
<br />14 2500.515 hiM1H046 CASTING EACH 1 360,00 1.00 350.00 1,00 350.00
<br />15 2531,501 CONCRETE CURS LP 30 22.00 67.00 1,474.00 67.00 1,474.00
<br />16 2,31.002 PEDESTRIAN RAMPS EACH 1 225.00 1.00 275.00 1.00 225.00
<br />17 25355.501 OTT CURB IF 575 5.00 669,00 2,00000 68000 2,800.00
<br />13 2575,505 SODDING SY 200 8.00 0.00 0.00 0.00 0.00
<br />19 SPEC ELECTRICAL LS 1.00 11737.94 1.00 11.737.84 1.00 11,737.04
<br />20 SPEC d' CONCRETE SLAB SF 130 3.80 123,00 442.00 12500 44200
<br />21 SPEC 0.ORVMINOUS PATH (NO ClA665) LS 1 5700.00 1.00 5.700.00 100 5,700,00
<br />T
<br />SCHEDULE 40- FIRSTBANK ORM (C002) -TOTAL 89,068.03 09008.03
<br />nip SUMMARY
<br />SCHEDULE 1.0- STREET RECONSTRUCTION -TOTAL 808,029,54 844,500,83
<br />SCHEDULE 2.0 • STORM SEWER -TOTAL 7,081.00 228.441.01)
<br />SCHEDULE 3.0 UTTLE CANADA ROAD SANITARY SEWER -TOTAL 0.00 29,455.72
<br />ScIIEDULE 4,0- FIRST BANK ORIV6 (CO 02)• TOTAL 00,008,83 80,000,03
<br />TOTAL OLD SUMMARY11416 PERIOD 6401,15047
<br />1'OTALOID SUMMARY TO 0078 51,192.474,40
<br />AMOUNT EARN®'
<br />AMOUNT RETAINED
<br />MATERIAL ON SITE
<br />MATERIAL OEOUC&.
<br />PRtV10U9 PAYMENTS '
<br />A4AOUNTDUE
<br />TOT*
<br />8'.PERIDD,t•; TO,TAL:TO,OAiEQ, -•; ;
<br />�.,.,
<br />.41 &401.159.47'.., 31,1470.48
<br />$20057.97, .1.58,622t72,.
<br />56,00 $0.00
<br />50.00
<br />5381Ti0/S0
<br />5751.74978
<br />$381,10150