My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-13-2000 Council Agenda
>
City Council Packets
>
2000-2009
>
2000
>
09-13-2000 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2012 2:29:33 PM
Creation date
6/26/2012 2:27:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A -6 With the assistance of the Public Works Department determine if future <br />projected needs can be accommodated by either the existing or a renovated <br />city garage. <br />2.2 Task B Evaluate Existing Equipment and Supplies Space Needs <br />B -1 Gather background information (i.e. pictures, manuals, specification, etc.) on <br />all Public Works equipment and supplies from Public Works Director and City <br />files. <br />B -2 Verify information on equipment and supplies. <br />B -3 Determine the current industry and OSHA space needs standards for our <br />existing equipment and supplies. <br />B-4 Recommend changes /corrections to enable equipment and supplies to meet <br />current standards. Include cost estimates for each change /correction. <br />2.3 Task C New Facility <br />C -1 Determine the largest building that can be built on the existing city garage <br />property with associated storage areas. <br />C -2 Develop the construction cost estimate for the building and site <br />modifications. <br />C -3 With the assistance of the Public Works Department determine if future <br />projected needs can be accommodated by a new facility on the existing <br />garage property with associated storage areas. <br />3.0 Report Phase <br />The report will be broken down into the main sections as indicated below. The <br />subsections may change based on study results. All assumptions are to be <br />presented in the report. <br />3.1 Task D Executive Summary <br />D -1 Prepare a one to two page summary of the report. <br />3.2 Task E Evaluation of Existing Facilities. <br />E -1 General summary of existing facilities, (buildings, equipment and supplies) <br />and current condition. <br />E -2 Present current applicable industry, EPA, MPCA, NFPA, and OSHA, <br />standards. <br />E -3 Identify deficiencies with all existing facilities. <br />2 of 3 <br />\ \CLCSRVO1 \HOME\GregS \City Garage\Study Scope of Woe <br />Page 54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.