My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-27-2000 Council Agenda
>
City Council Packets
>
2000-2009
>
2000
>
06-27-2000 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2012 2:51:26 PM
Creation date
6/26/2012 2:50:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PN!? <br />3ow*A77T'ITE74E <br />UNIT <br />TO <br />ATE <br />'.?IAOUN'i` <br />SCHEDULE 4.0- ARCADE STREET <br />TYPE 41 WEARING COURSE MIXTURE <br />2 BITUMINOUS MATERIAL FOR TACK COAT <br />T SCHEDULE 4.0•ARCADE STREET-TOTAL <br />TON <br />GAL <br />1360 527.85 0 50.00 1080 330,078.00 <br />820 51.00 30.00 400 5400.00 <br />50.00 330.47800 <br />SCHEDULE 5.0•CHANGE ORDER #S <br />1 INSTALL FIBER OPTIC CABLE L5 1 342,000.00 0 50.00 542.000.00 <br />2 SUBSTITUTE ARCH PIPE LS t 52.252.70 0 50.00 52.252,70 <br />3 EXPLORATORY DIGGING (WATER SERVICE) LS 1 5200.00 0 50.00 5200.00 <br />4 DRAINAGE SWALE W/ FIELD STONE RIP RAP LS 1 52.820.00 0 50.00 1 52.820.00 <br />5 CHANGE FROM &FOOT TO 5-FOOT FENCE LS 1 4845.00 0 50.00 t 4645.00 <br />6 LOWER HYDRANT LS 1 5850,00 0 50.00 1 5650.00 <br />7 REMOVE CONCRETE LINED CMP LS 1 52,170.00 0 50.00 1 52.170.00 <br />8 CONSTRUCT POND AND SWALE LS 54 ,800.00 0 50.00 1 54,600.00 <br />9 TRAIL EXCAVATION LS 1 5800,00 0 $0.00 1 3800.00 <br />10 RECONSTRUCT EXISTING MANHOLE l5 t 32,414,00 0 30.00 1 52.414.00 <br />T SCHEDULE 5.0- CHANGE ORDER #1•TOTAL <br />BASE BID SUMMARY <br />SCHEDULE 10 EAST BROOKS STREET RECONSTRUCTION - TOTAL <br />SCHEDULE 2.0 VIKING DRIVE RECONSTRUCTION • TOTAL <br />SCHEDULE 3.0 MINNESOTA AVENUE RECONSTRUCTION • TOTAL <br />SCHEDULE 4.0 ARCADE STREET -TOTAL <br />SCHEDULE 5.0- CHANGE ORDER #1 -TOTAL <br />BASE BID SUMMARY • TOTAL <br />AMOUNT EARNED,. <br />AMOUNT RETAINED <br />MATERIAL ON SITE' <br />MATERIAL DEDUCT' <br />PREVIOUS PAYMENTS <br />Deduct to recycled aggregate base class 5 from Pay Estimate #1 <br />80SI4O1'PAYEST6.W <br />50.00 557,261.70 <br />58,598.00 <br />531.355.86 <br />313,648-52 <br />50.00 <br />PiL4PERI0D �71'AT'A4 7c1.!.TE <br />50.00 <br />353.602.36 <br />ST/8.308.10 <br />Page 15 <br />367.760.39 s/# <br />3508,030.62 1/ <br />3115.789.39 <br />530.478.00 <br />557,281.704/ <br />3779,306.10 '/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.