My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-13-2000 Council Agenda
>
City Council Packets
>
2000-2009
>
2000
>
06-13-2000 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2014 1:20:05 PM
Creation date
6/26/2012 3:02:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Michael I. Fahey <br />COUNCIL <br />Beverly Scalze <br />Jim LaValle <br />Steve Morelan <br />Bob Pedersen <br />515 Little Canada Road, Little Canada, MN 55117-1600 ADMINISTRATOR <br />(651) 484 -2177 / FAX: (651) 484 -4538 Joel R. Hanson <br />Email: cityhall @ci.little - canada.mn.us <br />MEMORANDUM <br />TO: Mayor Fahey and Members of the City Council <br />FROM: Joel Hanson, City Administrator <br />DATE: June 9, 2000 <br />RE: Color Concrete Versus Paver Brick Issue <br />Since our last Council meeting, I have learned that we misrepresented the price difference <br />between color concrete and paver bricks. The $30,000 additional cost did not cover <br />replacing all color concrete with paver bricks. Rather it only allowed for 6,700 square <br />yards of area versus 21,200 square yards of total colored concrete surface area. <br />The 6,700 -yard amount was for the colored concrete bands extending perpendicular from <br />behind the curb through the sidewalk panels. It did not include 14,500 square yards of <br />colored concrete between the sidewalk and the curb. (This is the area we all assumed <br />was being discussed.) <br />Due to time constraints, I instructed the Engineers to bid the project three ways. They <br />are: <br />♦ All color concrete (original design) - $135,135 plus engineering, <br />♦ Paver bricks between the curb and sidewalk (14,500 square yards) while <br />maintaining the colored concrete bands (6,700 square yards) - $195,745 plus <br />engineering; <br />♦ All paver bricks - $221,540 plus engineering. <br />I have large diagrams available for you to review to get a better feel for these options. <br />They are posted in the Council Chambers. <br />If you have any questions, please contact me. <br />Page 102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.