Laserfiche WebLink
2. First Bank Drive between Rice Street and Market Place Drive be <br />repaired and overlayed to bring it up to engineering standards sufficient <br />to support the expected bus traffic. <br />3. A minimum of 4 above grade planters with a combination of shrubs and <br />flowers be installed in the hub area. These planters are to be maintained <br />by Metro Transit and be consistent with street scape components <br />prepared for Little Canada Road. <br />4. Easements be obtained from adjoining property owners for construction <br />and any permanent facilities. <br />5. Metro Transit will be responsible for removal of snow from the hub <br />shelters and the sidewalk along the south side of the First Bank Drive. <br />6. Metro Transit agrees to remove shelters and artillery facilities within 30 <br />days of hub being discontinued. The City of Little Canada will retain the <br />street lights and planters. <br />7. All state and local permits be obtained prior to initiation of construction <br />of this project. <br />\ \CLCSRVOI \HOMEVessicaj \Greg \Streets \Interim <br />Page 45 <br />