Laserfiche WebLink
NPR -05 -2000 14:4? <br />Mr. Anthony J. Pini, P.E_ <br />March 3, 2000 <br />Page Two <br />HR GREEN CO. 651 644 2 :49 P.2'13/05 <br />5. We have discussed further the issue of the drainage which flows around the building and <br />ultimately crosses the sidewalk between the parking lot and your proposed building. We <br />believe that the drainage should be swated and dropped into a structure and piped under <br />the sidewalk, the outlet through the proposed retaining wall, onto the St. Paul Water Works <br />property. This will avoid sheet flow over the sidewalk and eliminate any potential hazard <br />created by water flowing over the sidewalk. <br />If you have any questions regarding any of these issues, please call. <br />Sincerely. <br />Howard R. Green Company <br />tea— <br />Ca Greg Schroeder, Clty of little Canada <br />Steve Grittman, Northwest Associated Consultants, 5775 Wayzata Blvd, Suite 555, <br />St Louis Park, MN 55418 <br />awRa418o23io.nouaurr343-00APM WOc <br />Howard R. Green Company <br />CONSULTING-ENGINEERS • <br />TOTAL P.03 <br />Page 20 <br />