My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-22-2000 Council Agenda
>
City Council Packets
>
2000-2009
>
2000
>
03-22-2000 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2012 11:03:05 AM
Creation date
6/27/2012 10:54:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR -03- -2000 14:47 <br />Mr. Anthony J. Pini, P.E_ <br />March 3, 2000 <br />Page Two <br />HR GREEN CO. 651 644 2349 P.03'03 <br />5. We have discussed further the issue of the drainage which flows around the building and <br />ultimately crosses the sidewalk between the parking lot and your proposed building. We <br />believe that the drainage should be swaled and dropped into a structure and piped under <br />the sidewalk, the outlet through the proposed retaining wall, onto the St. Paul Water Works <br />property. This will avoid sheet flow over the sidewalk and eliminate any potential hazard <br />created by water flowing over the sidewalk. <br />If you have any questions regarding any of these issues, please call. <br />Sincerely, <br />Howard R. Green Company <br />TenyyJ. Mau�r, P�E.� <br />TJM:mw <br />Co: Greg Schroeder, City of Little Canada <br />Steve Grittman, Northwest Associated Consultants, 5775 Wayzata Blvd, Suite 555, <br />St. Louis Park, MN 55418 <br />O_WROJ1809310J1024014, 3.3-00 APInWdoo ' <br />• <br />Howard R. Green Company <br />CONSULTING-ENGINEERS • <br />Page 44 <br />TOTAL P.03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.