My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-08-2012 Additions
>
City Council Packets
>
2010-2019
>
2012
>
08-08-2012 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 1:58:09 PM
Creation date
8/8/2012 3:31:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER #1 <br />(Attachment) <br />This contract is amended as follows: <br />WHEREAS: After the initial bituminous base paving on Rosewood Drive, water from the <br />subgrade was drawn into the street base. <br />WHEREAS: An area of the street approximately 200 feet long showed signed of failure due to <br />saturated street base; and <br />WHEREAS: The Engineer determined that it was necessary to correct the area by excavation <br />and the installation of sand subgrade and draintile. <br />WHEREAS: The Engineer determined that is would be more cost effective to have the <br />Contractor complete the work prior to the final wear course paving at the bid unit <br />prices as outlined in the attached cost summary, and <br />WHEREAS: The Engineer directed the Contractor to complete as part of this project. <br />NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AND UNDERSTOOD THAT: <br />1. The Contractor shall complete the above described changes and additions to the project. <br />2. Payment for the work was reviewed and approved by the Engineer. <br />3. The Contractor will not make claim of any kind or character for any other costs or <br />expenses that he may have incurred or that he may hereafter incur in performing the <br />work or furnishing the materials of this agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.