My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-08-2012 Additions
>
City Council Packets
>
2010-2019
>
2012
>
08-08-2012 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 1:58:09 PM
Creation date
8/8/2012 3:31:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT: 2012 STREET AND UTILITY IMPROVEMENTS (Rosewood Repair) <br />OWNER: CITY OF LITTLE CANADA <br />SCHEDULE 1.0 - ROSEWOOD DRIVE CORRECTION <br />1 2021.501 MOBILIZATION LS 1.00 <br />2 2104.505 REMOVE BITUMINOUS PAVEMENT SY 333.33 <br />3 2105.501 COMMON EXCAVATION (P) CY 222.22 <br />4 2105.522 SELECT GRANULAR BORROW (CV) CY 111.11 <br />5 2105.604 GEOTEXTILE FABRIC SY 318.89 <br />6 2350.502 TYPE MV4 WEAR COURSE MIXTURE TON 50.00 <br />7 2503.602 CONNECT TO EXISTING STORM STRUCTURE EACH 2.00 <br />8 2502.541 4" PERF PE PIPE DRAIN W /SOCK LF 289.00 <br />9 2563.601 TRAFFIC CONTROL LS 1.00 <br />1,000.00 1,000.00 <br />$3.50 1,166.67 <br />$17.00 3,777.78 <br />$17.00 1,888.89 <br />$3.00 956.67 <br />$65.90 3,295.00 <br />$775.00 1,550.00 <br />$1.50 433.50 <br />$500.00 500.00 <br />SCHEDULE 1.0 - ROSEWOOD DRIVE CORRECTION- TOTAL $14,568.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.