Laserfiche WebLink
PROJECT: 2012 STREET AND UTILITY IMPROVEMENTS (Rosewood Repair) <br />OWNER: CITY OF LITTLE CANADA <br />SCHEDULE 1.0 - ROSEWOOD DRIVE CORRECTION <br />1 2021.501 MOBILIZATION LS 1.00 <br />2 2104.505 REMOVE BITUMINOUS PAVEMENT SY 333.33 <br />3 2105.501 COMMON EXCAVATION (P) CY 222.22 <br />4 2105.522 SELECT GRANULAR BORROW (CV) CY 111.11 <br />5 2105.604 GEOTEXTILE FABRIC SY 318.89 <br />6 2350.502 TYPE MV4 WEAR COURSE MIXTURE TON 50.00 <br />7 2503.602 CONNECT TO EXISTING STORM STRUCTURE EACH 2.00 <br />8 2502.541 4" PERF PE PIPE DRAIN W /SOCK LF 289.00 <br />9 2563.601 TRAFFIC CONTROL LS 1.00 <br />1,000.00 1,000.00 <br />$3.50 1,166.67 <br />$17.00 3,777.78 <br />$17.00 1,888.89 <br />$3.00 956.67 <br />$65.90 3,295.00 <br />$775.00 1,550.00 <br />$1.50 433.50 <br />$500.00 500.00 <br />SCHEDULE 1.0 - ROSEWOOD DRIVE CORRECTION- TOTAL $14,568.50 <br />