Laserfiche WebLink
STORMWATFR POND ALONG WASHOUT <br />1 COMMON EXCAVATION <br />2 OUTLET STRUCTURE <br />3 RANDOM RIPRAP. CL UI <br />4 WOOD FIBER BLANKET <br />5 ENKAMAT <br />6 SEED AND MULCH <br />7 CLEARING AND GRUBBING <br />8 SODDING <br />T TOTAL <br />o:â– pro;18044901804490D1S <br />CY 2000 <br />EA 1 <br />TN 20 <br />SY 2500 <br />SY 200 <br />ACRE 1.25 <br />ACRE 1.25 <br />SY 300 <br />10.00 <br />5000.00 <br />60.00 <br />2.50 <br />8.00 <br />2500.00 <br />4000.00 <br />2.50 <br />20000.00 <br />5000.00 <br />1200.00 <br />6250.00 <br />1600.00 <br />3125.00 <br />5000.00 <br />750.00 <br />42925.00 <br />BID SUMMARY <br />COUNTY ROAD D NORTH INLET 5000.00 <br />ENKAMAT AND RIPRAP SWALE ON BACK LOT LINE 31375.00 <br />PIPE TO EXISTING POND AT SOUTH END MAPLE LEAF COURT 41940.00 <br />STORMWATER POND ALONG WASHOUT 42925.00 <br />Page 133 <br />