My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-28-1999 Council Agenda
>
City Council Packets
>
1990-1999
>
1999
>
07-28-1999 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2012 12:50:05 PM
Creation date
8/22/2012 12:03:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-owarc R. Green Company <br />CONSULTING ENGINEERS <br />July 14, 1999 <br />File: 804490J <br />Mr. Jerry Urban <br />City of Vadnais Heights <br />687 County Road F E. <br />Vadnais Heights, MN 55127 <br />RE: DRAINAGE ISSUE — MAPLE LEAF COURT, CITY OF LITTLE CANADA <br />Mr. Urban: <br />We have examined the site contributory to Maple Leaf Court in the City of Little Canada <br />regarding a drainage problem. We have confirmed the contributing drainage areas referenced <br />in Terry Noonan's letter dated June 17, 1999 with one exception. We have added 0.46 acres to <br />the contributing area of Little Canada. This area is east of Maple Leaf Court and was not <br />included in Mr. Noonan's original calculations. <br />Based on discussions between representatives from Little Canada, Vadnais Heights, and <br />Ramsey County, a consensus was reached to proceed with the option of constructing an <br />Enkamatlriprap swaie. As discussed in our meeting on July 1, 1999, the City of Little Canada <br />will assume responsibility for all overhead costs associated with the design as the initiator of the <br />project. The total estimated overhead costs for design are 59,600.00. Construction costs are <br />proposed to be divided among Little Canada, Vadnais Heights, and Ramsey County. The <br />construction cost has increased slightly due to further erosion since the initial estimate. The <br />total project costs are as follows: <br />Total estimated construction cost <br />Construction Staking <br />Construction Inspection <br />Total Project Cost <br />= 550,500.00 <br />= $ 1,000.00 <br />= $ 2,000.00 <br />= $53,500.00 <br />We have revised the cost split between Little Canada, Ramsey County, and Vadnais Heights <br />based on Vadnais Heights' weighting for storm sewer assessments as determined at the July 1, <br />1999 meeting. The cost split is as follows: <br />Contributor Contributing Weight Weighted Area %Total Area Cost Share <br />Area <br />Little Canada <br />Ramsey County <br />Vadnais Heights <br />2.08 acres <br />1.41 acres <br />4.70 acres <br />1.0 <br />3.0 <br />2.5 <br />2.08 <br />4.23 <br />11.75 <br />12% <br />23% <br />65% <br />$6,420.00 <br />$12,305.00 <br />$34,775.00 <br />RECEIVED WiL 1 5 -�cag <br />0:1PR0J580449015490 -1401. j uly99.doc <br />1326 Energy Park Drive • St. Paul, MN <br />Page 137 <br />S4-9446 toll free 888/368 -4389 <br />
The URL can be used to link to this page
Your browser does not support the video tag.