Laserfiche WebLink
Construction Cost Split Based on Peak Flows <br />DEN /st <br />Total estimated construction cost <br />Construction Staking <br />Construction Inspection <br />Total Project Cost <br />= $42,000.00 <br />= $ 1,000.00 <br />= $ 2,000.00 <br />= $45,000.00 <br />Contributor <br />Contributing Area <br />% Total Area <br />Cost Share <br />Little Canada <br />Ramsey County <br />Vadnais Heights <br />3.70 cfs <br />5.40 cfs <br />13.00 cfs <br />16.74% <br />24.44% <br />58.82% <br />$7,533.00 <br />$10,998.00 <br />$26,469.00 <br />Howarc <br />O:\PROJ \804490] \0325\490.2104.actdoc CC <br />is &noth- <br />ctiv — de,,t s kae^ d c wl v fr <br />Page 136 <br />-any <br />3 <br />