Laserfiche WebLink
B2 Drainage Improvements /Roadway Reconstruction <br />Cost Responsibility Summary <br />(as of 3/01/99) <br />Construction Work Items <br />Responsible Party <br />Estimated Cost <br />Contribution <br />Edgerton Catch Basin Replacement <br />Ramsey County Public <br />Works <br />$4,400 <br />County Road B2 Reconstruction/Repaving <br />Ramsey County Public <br />Works <br />Unknown <br />B2 Area Ditch Maintenance /Ditch Construction/ <br />Flood Control Berming <br />Ditch Maintenance <br />RWMWD <br />$6,400 <br />Permanent Easements <br />City of Little Canada <br />Unknown <br />Ditch Construction <br />RWMWD <br />$4,200 <br />Berm Construction <br />RWMWD <br />$5,750 <br />B2 Existing Pipe Improvements <br />Ramsey County <br />$10,200 <br />Conveyance Culvert through B2 <br />RWMWD <br />$6,000 <br />Greenbriar Circle Drainage Improvements <br />City of Little Canada <br />$30,950 <br />Total Estimated Construction Costs <br />$67,900 <br />RWMWD contribution <br />Construction $22,350 <br />Contingency $ 6,700 <br />Engineering* $13,500 <br />Total Contribution $42,550 <br />City of Little Canada contribution <br />Construction $30,950 (plus cost of permanent easement acquisition) <br />Contingency $ 9,300 <br />Engineering" $18,600 <br />Total Contribution $58,850 <br />Ramsey County contribution <br />Construction $14,600 (plus County Road B2 Milling/Repaving /Curbing cost) <br />Contingency $ 4,400 <br />Engineering* $ 8.800 <br />Total Contribution $27,800 <br />`see attached breakdown <br />204655 <br />Page 44 <br />