My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-1999 Council Workshop Agenda
>
City Council Packets
>
1990-1999
>
1999
>
03-10-1999 Council Workshop Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2012 2:22:11 PM
Creation date
8/29/2012 2:21:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the rural street is to be upgraded to urban design. Rural <br />streets that are not upgraded will generally be <br />rehabilitated via a bituminous overlay of 1.5" - 2" subject <br />to the condition of the existing street. <br />B. Storm Sewer <br />Storm sewer improvements are considered to be an integral <br />part of the street reconstruction. The Minnesota Department <br />of Transportation uses a storm frequency of ten years in <br />designing highway drainage systems. The City of Little <br />Canada uses a five year storm for design of storm sewer <br />systems. A storm frequency of 50 or 100 years is used if <br />extensive damage would result from an inadequate storm <br />sewer. A lesser storm frequency may be used for design <br />purposes if an adequate overflow drainageway is present. <br />C. Sidewalks, Trails, and Bikeways <br />Concrete - 4" thick, 5' wide, w /4" class 5, 100% crushed <br />rock. <br />Bituminous - 2" thick, 8' wide, w /6" class 6, 100% crushed <br />rock. <br />Sidewalks and trails are to be located 1' off the property <br />line where possible. Pedestrian ramps and curb drops will <br />be installed according to MN /DOT Standards and Americans <br />with Disabilities Act (ADA) requirements. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.