My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-10-1999 Council Agenda
>
City Council Packets
>
1990-1999
>
1999
>
02-10-1999 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2012 2:58:02 PM
Creation date
8/29/2012 2:56:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Degradation Cost <br />If the City of Little Canada agrees to complete the restoration of the right -of -way where <br />a utility chooses only to patch its excavation, a degradation cost can be applied to the <br />excavation fee. These costs include the effort to remove any temporary materials and <br />the proper restoration of the right -of -way surface to the maximum standards adopted by <br />the PUC (Public Utilities Commission). <br />Administration <br />Design <br />Schedule <br />Coordinate <br />Work <br />Removals <br />Restoration per Standards <br />Compaction <br />Materials <br />Labor <br />Equipment <br />4. Obstruction Permit <br />30 minutes $19.58 <br />Fee for each item is based on cost per square <br />foot for the area to be restored at current <br />market rates as determined by the Public <br />Works Director <br />Removal fee based on cost per square foot at <br />current market rates as determined by the <br />Public Works Director. <br />Restoration fee for each item based on the <br />cost per square foot for the area to be restored <br />at current market rates as determined by the <br />Public Works Director. <br />Obstruction within the right -of -way that exceeds the established increment of time <br />requires City of Little Canada notification and possible follow up inspection and <br />recording. <br />Administration <br />Review <br />Inspection <br />15 minutes <br />15 minutes <br />30 minutes <br />$05.30 <br />$09.79 <br />$19.58 <br />Permits can be extended before they expire with a formal request for extension. This is <br />a new cost fee. <br />Administration <br />Review <br />Inspection <br />15 minutes <br />15 minutes <br />30 minutes <br />Par'' �g <br />$05.30 <br />No Charge <br />$19.58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.