Laserfiche WebLink
06/16/99 11:35 PRATT HOMES + 4844538 <br />00/15/99 14:39 FAX 851 490 Z] U <br />Jaa JA. LAvu <br />NO.082 P002 <br />S SEH MEMORANDUM <br />3535 Vadnais Center niive .200SEH Center, St NW, MN551104118 6514902000 600.325,2055 051.490.2150 FAX <br />TO: <br />PROM: <br />DATE: <br />RE: <br />David C. Hahn, P.E., City Engineer <br />James P. Norton. P.E. •? 14. <br />June 9, 1999 <br />City of Vadnais Heights <br />Water System Plan Update Status Report <br />SEFI No. A- VADNA9911.00 <br />The following is a status report on the Water System Plan Update. <br />0 ot <br />fice Q. boe <br />a. <br />City of Little Canada <br />We have field investigated the route for serving that portion of Little Canada that is north of highway 694. <br />This area could easily be served by the City.of Vadnais Heights and would provide a looped portion of the <br />trunk water main through that area as well. Mike Blle and I investigated this in the field, saw where the <br />pipeline could be routed and verified that is was a construction possibility. <br />Hydraulic Analysis of Distribution System <br />We have been working on the hydraulic analysis of the distribution system for the last couple of weeks. <br />Some of the trunk lines have been identified and the water model Is being prepared. Puttae items that need <br />to be incorporated into the model are some hydrant flow test information and verification of the elevation <br />of the water in the elevated towers. This will be done in the near future. <br />Emergency and Conservation Plan <br />The Fsgency. and Conservation Plan was prepared in draft form some time ago. It was not submitted and <br />we have been reviewing that draft form and are in the process of updating it to make it timely with regard <br />to the month and the year. That information will be submitted in the near future. - <br />Overall Schedule <br />Good progress has been made on the overall work for the Water System Flan Update. The first portion being <br />the hydraulic analysis of the distribution should be done on time. Thar should be toward the middle or end <br />of the month of Jnne and from there we will be able to work on the other items such as the storage <br />requirements including fire flows and start on the emergency planning and water conservation planning. <br />sah <br />menonnyvAyasnostoeumintitrampa <br />Post a* Fax Note 7871 <br />°"e 6/ / 4 y,i P. i <br />Kee-Fe- <br />TO �t,.k <br />P1pim Norio.r <br />1" J <br />e°' Sell <br />gp <br />00 9f Ya4, .:. <br />ilk <br />Pnane. <br />9d9 -53113• <br />Ptw"e" 990 — 3/ Cc <br />Faxa 1109— Sava- <br />Fax4 44o ^a/,so <br />shot Ergot Hendrickson Inc. Offices located throughout the Upper Midwest <br />We help you plan, design, and achieve <br />Page 28 <br />EqualOppoiunity Employer <br />