Joel Hanson <br />'abject: RR Crossing Trail Project <br />Joel & Lee: <br />After looking at the costs and realizing that there is more involved than just the <br />crossing itself, and that this project is not going to go away and will only increase in <br />cost over time, I will support continuing with the project but at a more reasonable and <br />controllable pace. In order to do that I'm suggesting that we pay the $600 to extend the <br />permit to March of 2014. So, if it makes sense to let the railroad do their piece of the <br />work now...fine. And if it makes sense to get the free dirt now...good. But I don't think <br />it makes any sense to do any of the path work until well after the St Paul water <br />department has completed all of their work. I believe we will easily save the $600 by <br />doing all of the paving at the same time plus allowing us to bid the project at a time <br />when we may get better pricing. I also think we'll get a better finished product if we <br />don't try to push completion before the snow fly's. <br />Bill <br />> From: lelfering @elferingeng.com <br />> To: joel.hanson @ci.little - canada.mn.us; mcpuck93 @aol.com; <br />> john.t.keis @ampf.com <br />> CC: jkeis @aol.com; wrbles @hotmail.com; montourrick @comcast.net; <br />> shellymboss @aol.com; shellyb @frattalonecompanies.com; <br />> bill.dircks @ci.little - canada.mn.us; jim.morelan @ci.little - canada.mn.us <br />> Subject: RE: RR Crossing Trail Project <br />> Date: Thu, 6 Sep 2012 17:02:36 -0500 <br />All, <br />With St. Paul Water I will not say we ever know their plans for sure. <br />> The original trail alignment was supposed to avoid impacts and we know <br />> that is not the case. My understanding is that the St. Paul Water <br />> Works improvements will not be going outside of the construction <br />> fenced areas they have around the wells they are working on right now. <br />> Those wells, at least the ones affecting the trail, are the two north <br />> of South Owasso and the two south of South Owasso. The second well <br />> north of South Owasso actually has the chain link fence up right now <br />> is not proposed to have a connection to the other water conduit so <br />> that fencing should not be changing. Our rider agreements for the <br />> trails all indicate that any trail work /repair is the City's responsibility regardless <br />of why it is necessary. <br />> • In regards to the grades, the fill proposed to be brought to the site <br />> will result in a 5% grade up to the tracks from the south and then a <br />> little less than 5% going back down at the steepest points. That grade <br />> is noticeable while walking or riding a bike but is considered ADA accessible. <br />> The current permit requires the crossing construction to be completed <br />> by March 16, 2013 and no outside paving that I know of has ever been <br />> completed that early in the year. Therefore we have to get the trial <br />> paved this year to meet the permit date or the permit will need to be <br />> extended. Typically contractors pave into November of the year, but <br />> every year is different and it depends largely on temperature. <br />> Once the fill is placed I am not sure how we would decide not to <br />> finish the project. If the City did somehow decide to not finish the <br />> project after the fill was placed the RR may want the material we brought in removed. <br />> If there is concern over the project the City could hold off on the <br />> project, but that would require us to obtain another permit extension <br />> from BNSF which would cost $600.00 if we want the opportunity to <br />> complete the project next year. That would allow St. Paul Water more <br />1 <br />