My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-24-2012 Council Agenda
>
City Council Packets
>
2010-2019
>
2012
>
10-24-2012 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2012 8:33:59 AM
Creation date
10/23/2012 7:51:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recreation Facilities: <br />✓ Fire Barn Warming House - $150,000 in 2013. This project needs property issues resolved <br />with St. John's Church. <br />Public Works: The Public Works Superintendent put together the following descriptions: <br />Equipment: Ford F350 Supercab 4x4 Pickup $27,225 <br />Plow Package $7,700 <br />Tommy Gate Tailgate Lift $3,000 <br />Total $37,925 <br />Truck #400 is one of four pickups the City purchased in 2000. We have spread the replacement of <br />these trucks out over the past few years and the #400 is the last one to be replaced. It is primarily <br />used to haul equipment for sewer jetting and blacktopping operations. It has a Tommy Gate lift on it <br />so that heavy objects can be easily loaded and unloaded. The new truck will also have a plow <br />package so that it can be utilized during snow removal operations if necessary. The total net cost is <br />expected to be lower after truck #400 is sold. It is anticipated that the truck will sell for $5000- <br />$8000, bringing the net total cost down to $30,925 to $33,925. ($32,000 Budgeted) <br />Existing Truck: <br />New Truck: <br />
The URL can be used to link to this page
Your browser does not support the video tag.