Laserfiche WebLink
CHANGE <br />ORDER <br />A1A DOCUMENT C701 <br />Distnbucion co: <br />OWNER <br />ARCHITECT <br />CONTRACTOR (li <br />FIELD <br />OTHER Q <br />PROJECT: Little Canada Historical <br />(name. address> Society Addition <br />TO (Contractor): <br />C-4ANCE ORDER NUMBER: 10 <br />INITIATION DATE 6/24/98 <br />Ens ARCHITECT'S PRO IECrNO: <br />Franklin Drywall CONTRACT FOR: Gypsum Wall Board <br />2825 Country Drive <br />St. Paul, MN 55117 <br />L <br />CONTRACT DATE: 4/20/98 <br />You are directed to make the following changes in this Contract <br />Double Rock all Ceilings per City Inspector <br />Vol valid unnl signed by hoth the Owner and Arc)tnccr. <br />Signature or the Contractor indicates his agreement herewith. including any adjustment in the Cantrac Sum or Cantracr Trine. <br />The-original (Contract Sum> (Guaranteed Maximum Cost> was 5 6,880.00 <br />Net change by previously authorized Change Orders S. <br />The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was 5 6,880.00 <br />The (Contract Sum> (Guaranteed Maximum Cost) will be ( inceased) (decreased) (unchanged) <br />by this Change Order 5 935.00 <br />The new (ContractSuml (Guaranteed maximum-Cost) inducting this Change Order will be S 7,815.00 <br />The Contract Time will be (increased) (deceased) (unchanged) by <br />The Date of Substantial Completion as of the date of this Change Order therefore is <br />ARCitTEC. <br />Authorized: <br />0 ) Days. <br />CONTRACTOR OWNER <br />Address Address Address <br />BY 3Y 3Y <br />DATE DATE DATE <br />.UA DOCUMENT 0701 • CiANC ORDER • <br />'HE .AMERICAN INSTITUTE OF ARCiITECrS. :735 NEN <br />Page 110 <br />1978 <br />D.C. 25.00E <br />G: D't —1978 <br />