Laserfiche WebLink
CHANGE <br />ORDER <br />AIA DOCUMENT G701 <br />Distribution to: <br />OWNER [� <br />ARCHITECT <br />CONTRACTOR I2 <br />FIELD 0 <br />OTHER 0 <br />PROJECT: <br />(name, address) <br />TO (Contractor): <br />I INSULATION SERVICES <br />1308 9th AVENUE SO. <br />SOUTH ST. PAUL, NN 55075 <br />L <br />CHANGE ORDER NUMBER: 11 <br />INITIATION DATE: 06/29/98 <br />ARCHITECT'S PROJECT NO: <br />CONTRACT FOR: INSULATION <br />CONTRACT DATE: 04/20/98 <br />You are directed to make the following changes in this Contract: <br />INSTAT.T, BATTING TO PREVENT ATTIC INSULATION FROM GETTING <br />INTO SOFFIT AREAS. <br />Not valid until signed by both the Owner and Architect. <br />Signature of the Contractor indicates his agreement herewith. including any adjustment in the Contract Sum or Contract Time. <br />The-original (Contract Sum) (Guaranteed Maximum Cost) was $1749 <br />Net change by previously authorized Change Orders S. 70 <br />The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was S 1819 <br />The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) <br />by this Change Order 5 150 <br />The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be 5 1969 <br />The Contract Time will be (increased) (decreased) (unchanged) by ( ) Days. <br />The Date of Substantial Completion as of the date of this Change Order therefore is <br />Authorized: <br />ARCHITECT CONTRACTOR OWNER <br />Address Address Address <br />BY BY BY <br />DATE DATE DATE <br />AIA DOCUMENT G701 • CHANGE ORDER • A <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW <br />Page 1 1 1 <br />1978 <br />C. 20006 G701 — 1978 <br />