Laserfiche WebLink
June 2024 - Google Maps Street View <br /> <br />An interested buyer has proposed purchasing 39 W Viking Drive to construct a 4,200-square-foot <br />automotive repair facility featuring an 1,800-square-foot second-story apartment suite. The rear portion <br />of the lot would serve as a tow yard, with the apartment occupied by a tow yard attendant. The <br />proposal includes a U-shaped drive for front access, a security fence around the rear, and required <br />maintained access to the existing cell tower at the back of the property. The buyer intends to operate <br />the tow yard 24/7, while the repair facility/office would maintain regular business hours. <br /> <br />To facilitate this use, the property would require a rezoning, as neither the proposed outdoor storage <br />nor autobody work is permitted in the C-1 district. The proposed building layout would minimally <br />require setback exceptions. Consequently, the developer must apply for a Planned Unit Development <br />(PUD) and likely a Comprehensive Plan amendment, necessitating formal site drawings, engineering, <br />stormwater mitigation plans, and a development agreement. <br /> <br />As a legislative action rather than a quasi-judicial one, a PUD rezoning grants the City Council broad <br />discretion to evaluate the proposal based on a variety of factors, including long-term planning goals, <br />consistency with the Comprehensive Plan, potential environmental impacts, public health and safety, <br />and the overall benefit to the community’s tax base and character. Because of the significant expense <br />required for formal submittals, staff suggested the applicant provide a rough sketch and narrative for <br />preliminary council consideration. This discussion is non-binding and intended only to signal if there is <br />general support for the concept before the applicant commits to the full PUD process. <br /> <br />Staff worked with the applicant to develop a concept sketch (Attachment A). Given the likely triggers <br />for stormwater mitigation and engineering, this sketch is for conceptual discussion only and remains <br />subject to significant change. <br /> <br />The applicant provided the following narrative: <br />“My name is Austin Gorak. I own no worries towing and recovery. We have served the <br />greater saint paul area and surrounding suburbs for 6 years with their roadside assistance needs, <br />as well as property parking management services. As we grow larger we find ourselves <br />needing a more dedicated space for both towing and repair services. I would like to turn this <br />property into a space where we can do it all under one roof, as well as have the additional space <br />for future growth and continue to serve the local community. As outlined in the drawings we <br />plan to have a front auto repair shop and office, with an impound lot to the rear of the property, <br />outside of the public view. With having a dedicated lot, I would like to have on site living for <br />24 hour surveillance needs, as well as making sure the property stays in presentable conditions <br />at all times” <br />