My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-23-1997 Additions
>
City Council Packets
>
1990-1999
>
1997
>
04-23-1997 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 2:38:34 PM
Creation date
3/7/2013 2:37:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Common Areas <br />The Provinces <br />Scope of Work <br />nand <br />Total Costs <br />Carpeting Areas included are hallways, <br />entry border, stairways and storage areas <br />2,218 <br />$6.00 <br />13,308 <br />Carpeting takeup, disposal, 8 install <br />2,218 <br />$6.54 <br />14,500 <br />Light Fixtures (Lights to be replaced <br />include hallway, Stairway, high entry, and <br />outside door) (includes fixture and <br />installation) <br />94 <br />490 <br />7,762 <br />Painting (includes materials and labor; dry <br />wall areas only) <br />94 <br />490 <br />53,238 <br />Hallways <br />94 <br />150 <br />6,695 <br />Main Stairways <br />(walls and ceilings) <br />94 <br />650 <br />940 <br />Small Stairways <br />(walls and ceilings) <br />59 <br />350 <br />880 <br />Hand Rails <br />114 <br />230 <br />360 <br />Roofs (153 Bldg only) <br />RRepair where needed <br />5,000 <br />Garages <br />Roofs <br />94 <br />490 <br />53,238 <br />Garage Doors <br />94 <br />150 <br />38,350 <br />Partition Walls <br />94 <br />650 <br />4,000 <br />Repair cracks in brick <br />59 <br />350 <br />5,000 <br />Repair wood trim <br />114 <br />230 <br />4,000 <br />Exterior <br />Paint decks <br />94 <br />490 <br />7,867 <br />Secure (2) brick screening walls <br />between decks <br />94 <br />150 <br />9,000 <br />Retaining wall by south garages <br />94 <br />650 <br />1,000 <br />Unit Unarades <br />Units <br />Cast/unit <br />Carpeting <br />94 <br />490 <br />46,060 <br />Kitchen Vinyl <br />94 <br />150 <br />14,100 <br />Carpet & Vinyl Installation <br />(includes:takeup and disposal) <br />94 <br />650 <br />61,100 <br />Refrigerator <br />59 <br />350 <br />20,650 <br />Range <br />114 <br />230 <br />26,220 <br />Range Hood <br />114 <br />35 <br />3,990 <br />Dishwasher <br />98 <br />175 <br />17,150 <br />Install Dishwasher <br />98 <br />150 <br />14,700 <br />NC <br />41 <br />350 <br />14,350 <br />Counter Tops incl. install. <br />118 <br />250 <br />29,500 <br />Tax, shipping, misc. <br />16,108 <br />Other <br />Waterproof foundation Apt. 107 Bldg <br />155 <br />800 <br />Replace retaining wall by garages <br />2,000 <br />Landscaping <br />15,000 <br />Fire Safety Equipment <br />45,000 <br />Construction Supervision <br />45,000 <br />Miscellaneous /Contingency <br />50,000 <br />Page 21 <br />j bro'ncebocs\Bookl Scope pdm 42157 <br />TOTAL REHAB $ 593,628 <br />
The URL can be used to link to this page
Your browser does not support the video tag.