515 Little Canada Road, Little Canada, MN 55117 -1600 <br />(612) 484 -2177 / FAX: (612) 484 -4538 <br />MEMORANDUM <br />TO: File <br />FROM: Joel R. Hanson, City Administrator <br />DATE: August 7, 1997 <br />RE: Centerville Road Water Main Improvement — Neighborhood Meeting <br />MAYOR <br />Michael I. Fahey <br />COUNCIL <br />Beverly Scalze <br />Jim LaValle <br />Steve Morelan <br />Bob Pedersen <br />ADbIINISfUATOR <br />Joel R Hanson <br />A neighborhood meeting was conducted regarding the above - referenced project at 7:00 p.m. on <br />August 6, 1997 in the conference room of Little Canada's City Center. Paul Heuer of Bonestroo, <br />Rosene, Anderlik & Associates, Scott Tangen, Public Works Director, and Joel Hanson, City <br />Administrator were present representing the City of Little Canada. Jeff Vogel was the only <br />citizen in attendance. Paul reviewed the basics of the project. (See attached sheet for project <br />summary information.) He pointed out that we had received a petition from four residents in this <br />area asking for water main. He stated that we looked at various alignment options and were <br />proposing the east side of Centerville Road due to the ability to avoid impact to mature trees in <br />front of the residences. He noted that using the west side of the right -of -way does not work <br />because of tree impact as well as location of sanitary sewer lines. He stated a third alignment <br />was evaluated that is possible which would put the water main in the residents' front yards closer <br />to their homes. This would result in estimated cost savings to the project of about $6,000 to <br />$7,000 in addition to savings in connection costs due to shorter service runs. There would still <br />be some tree impact in this situation and we would need to acquire easements on a donated basis <br />if this alignment were to be followed. <br />It was noted that this project could wait until a later date, but will likely be required at the time <br />Centerville Road is reconstructed. Current schedules call for that work to occur in 2001. The <br />construction would be done by Ramsey County and water main could be installed in conjunction <br />with that project. <br />Mr. Vogel indicated that he supports the project, but could wait until a later date. He stated one <br />of his neighbors is having water quality problems and he indicated that either timeline would be <br />fine with him. <br />Page 4 <br />